Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹9.4 L+₹1.4 L (17.9%)Rejected-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 2 | Rejected-AOC L2 | |
| 3 | 3₹9.7 L+₹1.7 L (20.7%)Rejected-AOC H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | 3 | Rejected-AOC L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy not submitted with DD AND EMD FDR. |
Tender Value
Refer Docs
EMD Value
₹24,500
Closing Date
11 Apr 2023, 5:00 pmClosed
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE DDUN
Work of Annual Maintenance Contract of 132 kV Bindal Rishikesh and 132 kV Bindal Majra Transmission Lines under 132 kV Substation Bindal Dehradun
2023_PTCUX_56107_1
T 22 SE O and M CR DDun 2022 23
Open Tender
Electrical Works
Item Wise
365 days
Dehradun
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
EE O AND M DIVISION PTCUL YAMUNA COLONY DDUN
₹24,500
Yes
6 Sept 2023
13 Mar 2023
13 Apr 2023
13 Mar 2023
11 Apr 2023
13 Mar 2023
Amount
ROUTINE WORK- Work of patrolling of 132 kV Transmission lines tower to tower and submitting the patrolling report in prescribed format to Sub-Division 04 times in a year as per guideline of PTCUL Transmission line (O&M) manual, Emergency patrolling immediately after major tripping or other incidents and Detailed & through top tower patrolling for locating the faults or line defects in case the line does not hold after emergency patrolling of line. including labour, T&P and transport facility etc. Detail of Transmission Lines are given as following:-
132 kV Bindal-Rishikesh (Total Length 44.560 x 4= 178.24Kms.)
132 kV Bindal-Majra (Total Length 8.650 x 4 = 34.60 Kms.)
Lopping and chopping of trees and its branches near & under 132kV Transmission lines in fields/crops by removing one by one all branches & stems developing towards the line & removing the same from the 27 meter wide gallery of the line safely with rope for safety of line conductors and to minimize future trippings (Quarterly basis in a year). Detail of Transmission Lines are given as following:-
132 kV Bindal-Rishikesh (Total Length 44.560 x 4= 178.24Kms.)
132 kV Bindal-Majra (Total Length 8.650 x 4 = 34.60 Kms.)
ROUTINE WORK- Work of removing all the trapped waste material in river flood (During the monsoon season of 2023) like wild bushes, poly bags, clothes, plastic rope, tree & metal wires from the first section of the tower No. 5B, 6B, 7C+6, 8B+6, 10B+3, 11B, 13B, 14C+6, 16B+6, 17A+6 & 18B+6 of 132KV Bindal-Rishikesh-Majra D/C line throw all the waste material away from the tower to safe place around 10 mtr. away from the tower location (9 times in a year) as direction of PTCUL representative. (Total 11 x 9=99 Jobs)
M/s Singhal and Co
MSN CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .