Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | ₹8.7 L | L1 | Accepted-AOC ok |
| 2 | L2₹9.3 L+₹63,043 (7.25%)Rejected-AOC | ₹9.3 L+₹63,043 (7.25%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.4 L+₹72,130 (8.29%)Rejected-AOC | ₹9.4 L+₹72,130 (8.29%) | L3 | Rejected-AOC L3 |
Tender Value
₹8.8 L
EMD Value
₹17,600
Closing Date
23 Dec 2022, 3:00 pmClosed
NITIN BHATT
Saraswati Heritage Divn.1, Jagadhari
Installation of sign board signifying the Sarasvati river at various road crossings of River Sarasvati in block Bilaspur, Sarasvati Nagar, and Jagadhri in Distt. Yamuna Nagar.
2022_HRY_249233_1
2022CCCEC2DE 63E9 4A54 B8A8 5F7C4DB59C72463IRR
Open Tender
Civil Works
Works
75 days
JAGADHRI
3 documents required · 3 mandatory
₹1,000
₹17,600
Yes
6 Apr 2023
8 Dec 2022
23 Dec 2022
8 Dec 2022
23 Dec 2022
8 Dec 2022
8 Dec 2022 - 23 Dec 2022
Amount
Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works Through Rate
Painting over the wooden/metal surface with aluminium paint of approved brand and manufacture to give an even shade . 1. Two or more coats on new work Through Rate
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes Through Rate
MS plates, angles, channels etc. i/c fabrication Rate
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. Through Rate
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) Through Rate
Writing text and logo on Vinyl sheet to stick on MS sheet as desired by H.S.H.D.B Panchkula as per Sample provided. ( On both sides).
manoj govt contractor
The Sai Cooperative Multipurpose Society Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .