Tender Value
₹90.5 L
EMD Value
₹1.8 L
Closing Date
2 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
(i) Signalling work in c/w Yard improvement under jurisdiction of ADEN/CDG . (ii) Signalling work in c/w Yard improvement under jurisdiction of ADEN/UMB. (iii) Signalling work in c/w Yard improvement works in 20 yards under Sr.DEN/IV/UMB.
OT-12-2026-27
OT-12-2026-27
Open
180 Days
Unknown (Unspecified Location)
₹0
₹1.8 L
5 Jun 2026
5 Jun 2026
18 Jun 2026
Supply of terminal block 25mm center M-6 (ARA terminals) as per IRS spec. No.IRS-S- 75/2006 (Rev.2) & IRS drawing No. SA-23741A(Alt.4), SA-23745(Alt.5), SA-23746 & SA-23756(Alt.3). Inspection by: RDSO.
Supply of Electric Point Machine Non Trailable Design IRS type 220 mm Throw, Rotary 02 locking type, Minimum AC Immunity 160 V AC, with internal locking, along with ground connection and clamp point lock 60 KG TWS, and with complete tools, accessories as per RDSO/S-3454 and RDSO Drg. No.RDSO-S/11000, RDSO/S-3454 and RDSO Specn. IRS:S-24/2002 with Amendment-1 or latest.Inspection by: RDSO
Track drilling machine manual operated for drilling holes in Rail for bond wire size 7SWG. Inspection by: Consignee.
Supply of Insulation for 'L' type bracket for point fitting IRS type complete consisting of Insulation plate - 01 No. Ferrule - 02 Nos. Washers - 04 Nos.(Material Nylon 66). Inspection by : Consignee.
Supply of Insulation for 'P' bracket for point fitting IRS type complete consisting of Insulation plate - 01 No. Ferrule - 02 Nos. Washers - 04Nos. (Material Nylon 66). Inspection by: Consignee
Supply of William stretcher bar insulation set suitable for ground connection RDSO Drg No.-T-1.367, T-10368, T-10384 to IRS-23 and S-40 with latest amendment. The material should be procured from RDSO approved firm.approved firm.Inspection by: Consignee
Supply of DC Track circuit bond:-length 5 meter in stainless steel (Non Magnetic) 07 Multi stand wire 10 sq mm 2 layer insulation with SS ( Non Magnetic) web pin for fit designing and other side SS (Non Magnetic) Lug. Contractor should get approved of sample from Railway Engineer.Inspection by: Consignee
Supply of DC Track circuit bond:-length 3.5 meter in stainless steel (Non Magnetic) 08 Multi stand wire 10 sq mm 2 layer insulation with SS ( Non Magnetic) web pin for fit designing and other side SS (Non Magnetic) Lug. Contractor should get approved of sample from Railway Engineer.Inspection by: Consignee
Supply of GI wire 8 SWG (4mm dia) suitable for track circuit rail bonding. Inspection by: Consignee
Supply and fixing of MS Flat 40 mm x 6 mm size. Inspection by: Consignee.
Supply of Electric track drilling machine equipment consisting of Heavy duty electric 11 track drilling machine works on 110V 50 Hz AC with suitable interchangeable track mounting stand with depth adjusting facility . Make of heavy duty electric drilling machine is of Rallies or Wolf or Bosch or similar or better. Inspection by: Consignee.
Supply of drill Bit size 7.14mm HSS parallel shank twist drill (Jobber series) Make- Addison similar or better. Inspection by: Consignee
Supply of Digital AC/DC low current Clampmeter model KOICO 3540 or similar or better. Inspection by Consignee. Inspection by: Consignee
Supply of FRP type TLJB as per drg. No. SA-20101/M made of FRP material (FRP materail conforming to RDSO/SPN/151/97 or latest) complete with 450 mm long 25 mm dia pipe. Inspection by: Consignee
Supply of channel pins single groove, galvanized, 7mm suitable for 4 mm dia bonding wire as per specification no. IRS S 17&69/M or latest contractor should get the approval of sample from Railway Engineer before supply.Inspection by: Consignee
Supply of Web detector TX coll 21/25 KHZ-15 meters cable length for GG Tronics make HASSDAC as per RDSO specification No.- RDSO/SPN/17/2012 Version 3 or latest. Inspection by: RDSO
Supply Web detector RX coll 21/25 KHZ of HASSDAC compatible with existing web detector RX coll-model no:G36R, RDSO/SPN/17/2012 Version 3, Make G.G.Tronics or similar (Compatible with existing equipment) Inspection by: RDSO
"Web Detector (each set consists of 2 Nos.of TX and 2 Nos. of RX) for CEL make HASSDAC Systems as per RDSO Specn.No.RDSO/SPN/177/2012 or latest. (Phase Reversal Type). (Inspection by: RDSO).
Components for Clamp Type Ground Connection for Point Machine 220mm Stroke. Consists of :- 1.Clamp Point Lock 60kg (TWS) for B.G to Drg.No. RDSO/S3395A- Alt-1: 1 Set. 2.Drive rod to Drg.No. RDSO.S.3460 Alt- PTJ-1: 1 No 3. Drive rod lug to Drg.No RDSO.S.3461 Alt- PTJ-4: 1 No 19 4. Drop lug to Drg.No RDSO.S.3598 Alt-1:4 Nos 5.Switch Extension Bracket to Drg.No RDSO.S.3591, Alt-PTJ-1: 2Nos 6.Bush to Drg.No RDSO.S.3463: 1 No 7.Insulating Plate (RH) to Drg.No RDSO.S.3592: 1 No 8.Insulating Plate (LH) to Drg.No RDSO.S.3593: 1 No 9.Insulating Bush for Detector rod drop lug to Drg.No CWM 02120: 2 Nos 10. Insulating Bush for Lock rod drop lug to Drg.No CWM 02220 :2 Nos 11. Insulating Washer to Drg.No S.8640 :8 Nos 12.Pin complete to Drg No. CWM 02320 :1 No. Inspection by: Consignee
"Insulation Sets for Ground Connection, Made of Nylon for 220mm throw Point Machine as per Specification No. IRS.S.40/84 or latest. One Set consisting material of: (a) Insulating Washer Drg. No.-S-8640 = 12 Nos. (b) Insulating Washer Drg. No.- S-8640/1-04 Nos. (c) Insulating Washer Drg. No.-S-8640/2-02 Nos. (d) Insulating Bush Drg. No.-S-23199-06 Nos. (e) Insulating Bush Drg. No.-S-3463-01 No. (f) Insulating Bush Drg. No.-S- 22179-02 Nos. (g) Insulating Bush Drg. No.-S- 8912-02 Nos. (h) Insulating Plate Drg. No.-S-3404-02 Nos. (i) Insulating Bush Drg. No.-S-8813-04 Nos. (j) Insulating Plate RH Drg. No.-S-3592-01 Nos. (k) Insulating Plate LH Drg. No.-S- 3593-01 Nos. Material to be supplied from RDSO approved firms. Inspection by: Consignee"
Super gasketing compound coriom make of 200 ML cane. Inspection by: Consignee
"(Supply)-High Dieiectric insulating Varnish in 500 ml can as per specification attached in Annexure-1. Make:Brand..corium z/lupromax/Enecon only(Rdso recommend products ) Make-Corium Z 202R. Inspection by: Consignee"
Supply of Fuse auto changeover system for Railway Signaling System as per 23 RDSO/SPN/209/2012 rev.1 with latest amendments. One Automatic changeover Unit comprise 24 nos. of external Non Deteriorating Type or 'G' type fuses from 4 Amp to 10 Amp capacities which are in signaling circuits. System shall have 6 cards with monitoring arrangement of 4 fuses in one card. Inspection by: RDSO Above/
Supply, testing and laying of 2nd class well burnt 'B' class bricks in trench 01 breadthwise over the top of cable throught i.e. 8 bricks in one meter over whole of the cables. Bricks shall be got staked and got inspected by Rly. Representative before laying. Inspection by: Consignee.
Boring & Trenchless cabling along with supply and insertion of HDPE pipe of PE 80 PN 02 8 grade of 90mm dia with min. 6.7mm and max. 7.6mm wall thickness as per IS 4984:2016 in the bore for the laying of signalling/ Telecom/ Power cables under the track/ road.( cable lying is covered separately). HDPE pipe is to be supplied by the contractor. Inspection by: RITES
Fabrication, supply and fixing of concrete cable marker as per IRSEM drg. No. 15-D1. The marker shall be fixed at various places of cable route as per instruction of Eng. at site.Inspection by: Consignee Above/
Excavating and refilling of trench in Normal Soil to the level of ground with rammed 01 earth as per drg. No.(NR/S&T/CON/1.1/97-A) so as not to form a drain 0.3 Mtrs. Wide & 1Mtr. Deep on both side of the station alongside the track. It shall conform to the safe distance as per signalling and cable route plan in all type of soil, It also includes clearance of routes of trees & bushes. Lesser depth due to site condition shall be paid proportionately. Inspection by: Consignee
Laying of signalling/Telecom/power cables of different sizes as per approved Drg. No. NR/S&T/CON/1-1/97C and as per cable route plan approved by Railways and meggering of cable before and after its laying of all type of outdoor cables.Inspection by: Consignee.
"Termination of all cores of all types of main outdoor cables after its laying on both ends and providing number ferrule on each core under supervision of Railway representative. This 03 also includes preparation of test report for core to core and core to earth on prescribed Performa for each core of the cable separately. This also includes dressing and lacing of cables on both ends. Performa for testing and material for lacing to be supplied by the contractor. Termination of both end of core will be counted as one. Inspection by: Consignee.
"Fixing, wiring , Testing , adjustment of Point Machine as per standard practice. Its also includes: (i) Fixing of switch extension 'P' bracket, providing insulation for switch extension bracket, fixing ground connections, adjusting the correct opening of switches and adjusting the point machine with crank handle. ii) Wiring inside the point machine, erection & wiring of JB with lock & key as per drawing, provided with terminal strips (if required). (iii) Supply & fixing of GI pipes with flange for taking cable in to point machine and jn. Box through gland/GI pipe. (iv) Complete material for installation viz. point insulation material, Jn. box, GI pipe, gland pipe, wiring material, nut & bolts of various sizes, angle iron of size 75mmx75mmx10mm, channels for fixing the machine, lugs for point rodding and insulation materials for stretcher bar 90R/52kg/60kg as per .drg.no.SA-23171 (adv.) Alt.1 will be supplied by the contractor. (v) Smithy and fitting work required at site for complete installation of Gauge tie plate and insulation of GTP as per approved Drg.no.NR/S&T/CON/7-6/97 and william stretcher bar (if reqd.) will be done by the contractor. Machine shall be overhauled by contractor if required. (vi) This includes removal of existing gears and fixing the machine at raised level on channel as per standard practice to avoid flooding wherever required. (vii) Supply of ground connections of electric point machine, non insulated GTP & CTP extension plate,Jn. box and stretcher bar shall be made available by the Rlys. in which the supply of ground connections, Jn box is covered separately.Inspection by: Consignee"
Dismantling and releasing of Point equipments which includes all S&T fittings of electrical and mechanical, facing point lock/ hand plunger lock/ lock bar / holding bar/ EPD/ 05 mechanical detecter/ Pt. machine with all attachments. All dismantled material to be transported and stack in the store of DY.CMM/JUDW/SSB store depot or any SSE/Sig/Stores of UMB division or any other store of N.Rly as per consignee. Note :- Before dismantling joint survey is to be done with the site engr. and report to be submitted to the site engr. (1 Job= 1 Point). Inspection by: Consignee.
Cleaning, Scrapping, Painting and lettering of all newly installed and existing gears such as signals, point equipment, track circuit equipment with T.C. no. on rail app. Cases JB. TL JBs point rodding cranks, compensators etc. including gate equipment if existing in station section as 06 per the provision of IRSEM. All paints (ISI marked) shall be approved by Railway Engr. and painting material to be supplied by the contractor. This item also includes writing and painting requirement of all indoor and outdoor gears along with making of all circuit nos. near terminal and terminal boards/track in app. Cases, junction boxes, relay room, SMs room, writing of relay nomenclature fuse nos. and equipment nomenclature as the approved plans and as per provision of IRSEM. Inspection by: Consignee
Transportation of signaling /Telecom materials by road from various stores of SSE/Sig 07 & SSE/tele of UMB division or GZB depot, SSB depot, JUDW depo etc. as per the instructions of the railway representative at the site. The work also includes loading, unloading and stacking of the materials.Inspection by: Consignee
Concreting unscheduled items in concrete of 1:3:6 ratio in cement, coarse sand and aggregate 25mm at different places in the yard and plastering top in fine plaster of 1:4 cement sand 08 ratio. It also includes the excavation of earth as required at site and as per instruction of site in charge. The volume in cubic meters shall include the volume occupied by any CI foundation, trestle, MS angle or flat or GI pipe required to be embedded in the casting. Cement coarse sand and aggregate 25mm are to be supplied by the contractor.Inspection by: Consignee
Earth work for excavation and refilling around location boxes and signals etc. where 09 necessary including 50M lead and 1.5M lift. The lead is to be measured from centre of gravity of location to the centre of filling and lift from main ground level. The earth work should be well rammed including breaking of clods, leveling and dressing etc. as per instruction of Engineer at site.Inspection by: Consignee
Maintenance of signalling gears required for the execution of track machines such as unimate , MP-2007, CSM, DUMETC,BCM, SRM and any other track maintenance machine work includes:- a) Proper dressing of Track Leads jumpers/ removing & re-fixing of axle counter track devices as required by Railway representative at site before and after commencing of Unimate, MP- 2007, CSM, DUMETC, BCM, BRM & SRM etc machine. This includes replacement of defective jumpers Bonding etc. Jumper/Bonding will be provided by Railway. b) Dismantling & ReFixing Turn out, Installation and testing of rodding set for point machines and point machine as per direction of 10 railway representative at site. (c) All damaged cable due to unimate, MP-2007 CSM, DVO METIC, BCM SRM and any other Track maintenance machine work should be meggered properly and it required, should be replaced by the contractor as directed by railways representative at site. Cable will be supplied by railway. (d) It includes drilling hole in rail as per site requirement and any work of EOLB or sliding boom and earting arrangement of signalling gears. Any other work as per instruction of Railway Engineer. All T&P & Jigs required to execute the work will be supplied by contractor. Note: The team to be provided for this work should comprise of Black smith/Wire Man-1 No., and Helper- 3 Nos. (Machine Days =Numbers).Inspection: By Consignee.
Installation wiring testing and commissioning of Fuse change over system (FACS). This includes provision of common Buzzer & indication at ASM Room & ESM Duty Room and painting 11 of fuse details. This also includes fabrication of frame for installation of FACS at Station/ LC gate where installation of relay racks not feasible. Inspection: Consignee Inspection charges: None Payment Terms: 100% on commissioning(Per Unit should be read as Per Module).Inspection by: Consignee.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
STD-2022withAmndt1-11.pdf
ATTACHMENT
JPOforProtectionofcablesduringexecutionofvariousworks_2023.pdf JPO 2023
ATTACHMENT
GenConditionYardimprovement_00011.pdf
ATTACHMENT
JPOforProtectionofcablesduringexecutionofvariousworks_2023.pdf
ATTACHMENT
Download all tender documents and submit your bid