Loading…
Loading…
| Sl No | Description | Qty | Unit | Ajith T M L1 | BALAN M L2 |
|---|---|---|---|---|---|
| 1.00RENOVATION OF POND | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 276 | hour | 322.5 ₹89,010 Lowest | 350 ₹96,600 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,046.72 | cum | 240.45 ₹2,51,684.79 Lowest | 250 ₹2,61,681 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1,082.5 | cum | 122.28 ₹1,32,368.1 Lowest | 150 ₹1,62,375 |
| 1.00 | OD478903/2025-2026:DRY RUBBLE MASONRY with hard stone, in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.Modified From 60.7.1 | 233.25 | cum | 3,727.23 ₹8,69,383.85 Lowest | 4,000 ₹9,33,008 |
| 1.00 | OD466076/2025-2026:Laterate Masonry with neatly dressed stone of size 35x20x20 cm or nearest size in cm 1:6 for foundation and basement including all cost of materials labour charges etc complete(MOD 50.6.7.1 of DAR | 172.06 | cum | 6,496.02 ₹11,17,692.21 Lowest | 6,500 ₹11,18,377 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 49.9 | cum | 9,299.67 ₹4,64,025.63 Lowest | 10,000 ₹4,98,970 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 61.62 | sqm | 783.63 ₹48,283.36 Lowest | 800 ₹49,292 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,492.79 | kilogram | 104.93 ₹3,66,498.45 Lowest | 150 ₹5,23,918.5 |
Tender Value
₹33.4 L
EMD Value
₹50,000
Closing Date
10 Mar 2026, 3:00 pmClosed
AE LSGD
PANNYANNUR GP
PANNYANNUR GP PRO NO 234/2025-26 RENOVATION OF VAALAL KULAM GENERAL CIVIL WORK
2026_LSGD_842573_1
NO/11/ETENDER/2025-26/AE/LSGD
Open Tender
Civil Works - Water Works
Item Rate
240 days
PANNYANNUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
17 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
RENOVATION OF POND
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD478903/2025-2026:DRY RUBBLE MASONRY with hard stone, in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.Modified From 60.7.1
OD466076/2025-2026:Laterate Masonry with neatly dressed stone of size 35x20x20 cm or nearest size in cm 1:6 for foundation and basement including all cost of materials labour charges etc complete(MOD 50.6.7.1 of DAR
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1421660.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1421660.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.85 MB
affidavit.pdf
Tender Documents • 0.24 MB
epay.pdf
Tender Documents • 0.23 MB
integrity.pdf
Tender Documents • 0.23 MB
fot.pdf
Tender Documents • 0.25 MB
prelimim.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .