Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance C 15 TTS JYOTHINAGAR NTPC RAMAGUNDAM PEDDAPALLI TELANGANA 505215 INDIA | PEDDAPALLI | TELANGANA | 505215 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance QTR NO 111 JME COLONY TYPE II POST YOGICHAURA SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
11 Feb 2021, 3:00 pmClosed
Ashima Chandra Dy.Mgr(CnM)
Muzaffarpur Thermal Power Stat PO Kanti, Distt. Muzaffarpur Muzaffarpur 843130
Biennial Maintenance Contract for CHP Electrical System for the Year 2021-23
2021_KBUNL_46569_1
NTPC/KBUNL/9900214082
Limited
Serv - Others
Service
730 days
Muzaffarpur Thermal Power Stat PO Kanti, Distt. Mu
3 documents required · 3 mandatory
₹0
Exempted
19 Feb 2021
30 Jan 2021
12 Feb 2021
30 Jan 2021
11 Feb 2021
30 Jan 2021
30 Jan 2021 - 4 Feb 2021
BMC for CHP Electrical System
HT MOTORS (<=500KW) 04W CHKS
HT MOTORS (<=500KW) 48W Chks (OH)
HT MOTORS(<=500KW)-Attend Defect
HT MOTORS(<=500KW)-Repl
HT MOTORS (T.BOX) Connection
LT MOTOR (>2.2-5.5KW) 04W CHKS
LT MOTOR (>5.5-18.5KW) 08W CHKS
LT MOTOR (>18.5-37KW) 04W Chks
LT MOTOR (>37-55KW) 04W Chks
LT MOTOR (>55-90KW) 4W Chks
LT MOTOR (>90KW) 04W Chks
LT MOTOR(>2.2-5.5KW)-OH
LT MOTOR(>5.5-18.5KW)-OH
LT MOTOR(>18.5-37KW)-OH
LT MOTOR(>37-55KW)-OH
LT MOTOR(>55-90KW)-OH
LT MOTOR(>90KW)-OH
LT MOTOR (>2.2-5.5KW) SHIFTING
LT MOTOR (>5.5-18.5KW) SHIFTING
LT MOTOR (>18.5-37KW) SHIFTING
LT MOTOR (>37-55KW) SHIFTING
LT MOTOR (>55-90KW) SHIFTING
LT MOTOR (>90KW) SHIFTING
LT MOTOR (>2.2-5.5KW) Connection
LT MOTOR (>18.5-37KW) Connection
LT MOTOR (>55-90KW) Connection
Switchgears (MODULE) 04W CHKS
Switchgears (BREAKER) 04W CHKS
Switchgears (MODULE) ATTEND BREAKDOWN
Switchgears(6.6KV)-OH
Switchgears(0.4KV)-OH
Breakers (6.6KV) 8W Chks
Breakers(6.6KV)-OH
Switchgears(6.6KV)-Attend Defect
Current TFR(<>)-Repl
Relays (<>) Repl
MATL (MISC) EQPT ERN/COMMG
PA System (<>) Checking
PA System(<>)-Attend Defect
PA System (<>) Instal/Remove
Pull Chord/ BS/ZSS (<>) 12W Chks
Pull Chord/ BS/ZSS (<>) ATTEND BREAKDOWN
Control Panels (<>) Checking
Control Panels (<>) ATTEND BREAKDOWN
Elec Hoists (>03-05MT) 12W CHKS
Elec Hoists (<>) ATTEND BREAKDOWN
Travelling Tripper (<>) 04W Chks
Travelling Tripper(<>) ATTEND BREAKDOWN
ILMS/OBMS/SM (<>) 12W Chks
PM OF FLAP GATES/RPG (12W Chks)
Flap Gates (<>) ATTENDBREAKDOWN
Cables (LV) Jointing
MATL (<>) SHIFTING
LT MOTOR (TERMINAL BLOCK)
MAINT. OF MISC. ELEC. EQUIP. IN SHIFT
DEPTT <> MAN.DEP-SUP
DEPTT <> MAN.DEP-SW
DEPTT <> MAN.DEP-SSW
SR ELECTRICALS
M/S ROYAL ELECTRICAL AND CIVIL CONSTRUCTION
GOVIND CONSTRUCTION
NEW GOLDEN REGRIGERATION
TEKANIKA ENGINEERING ENTERPRISE
FRIENDS ENGINEERING WORKS
M/S LARSON POWER ENGG CO.
TULIP TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .