Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC Accepted Vide Resolution No.1(6) dtd.24-02-2024 of Arimpur GP |
| 2 | L2₹2.1 LRejected-Finance | ₹2.1 L | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | DAVIS P.P L1 | Harish Kumar A L2 |
|---|---|---|---|---|---|
| 1.00AYURVEDA HOSPITAL ADDITIONAL FACILITIES | |||||
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 108 | sqm | 137.73 ₹14,874.84 | 138.43 ₹14,950.44 |
| 1.00 | OD296496/2023-2024:Roofing with GI hard colour powder coated traffod sheets 0.35mm thick or nearest available
thickness with overlaps of 150mm at ends and GI hook or crank CI bolts and nuts.Including
plain washers and bitumen washers etc.complete. | 153.6 | per sqm | 649.31 ₹99,734.02 | 652.62 ₹1,00,242.43 |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 90 | kg | 162.06 ₹14,585.4 | 162.89 ₹14,660.1 |
| 1.00 | 50.18.9.18.2:Providing and fixing PVC pipes including fixing the pipe with clamps/Clips at 1.00 m spacing. This included jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 75 mm dia 4 Kfg/cm2 - External work - Exposed on wall | 12 | metre | 230.64 ₹2,767.68 | 231.82 ₹2,781.84 |
| 1.00 | OD296510/2023-2024:Providing and fixing UPVC Rain water collection gutters of size 150*100mm with 3mm thick of approved make,fixing done with G.I holders of 5mm thick,with necessary fittings as per requirements&directions of Dept.engineers at site,including cost of all materials with holder clamp&fittings,labour for fixing,scaffolding charges etc.complete | 19.6 | metre | 506.94 ₹9,936.02 | 509.53 ₹9,986.79 |
| 1.01 | OD296530/2023-2024:Ridge capping with pre painted galvanised steel sheets 0.5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete. details of cost for 10.35m. | 9.8 | metre | 615.73 ₹6,034.15 | 618.87 ₹6,064.93 |
| 1.01 | 14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work | 67.2 | sqm | 90.34 ₹6,070.85 | 90.8 ₹6,101.76 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 35 | kg | 148.01 ₹5,180.35 | 148.76 ₹5,206.6 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.84 | cum | 6,542.28 ₹5,495.52 | 6,575.67 ₹5,523.56 |
Tender Value
₹2.2 L
EMD Value
₹5,496
Closing Date
23 Feb 2024, 3:00 pmClosed
ASSISTANT ENGINEER,LID AND EW ,ARIMPUR GP
ASSISTANT ENGINEER,LID AND EW ,ARIMPUR GP
PRO.NO. 282/24 PREPARATION OF ADDITIONAL FACILITIES FOR AYURVEDHA HOSPITAL
2024_LSGD_651301_22
10/AE/LID EW/AMPR/2023-24
Open Tender
Civil Works - Buildings
180 days
ARIMPUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,496
Yes
24 Jun 2026
16 Feb 2024
24 Feb 2024
16 Feb 2024
23 Feb 2024
16 Feb 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1020423.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid