| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC 176 RACE COURSE DEHRADUN | BAGESHWAR | UTTARAKHAND | 263619 | ₹4.5 Cr Quoted ₹3.8 Cr | L1 | Accepted-AOC Accepted. |
| 2 | L2₹3.9 Cr+₹5.2 L (1.36%)Rejected-AOC 5 A WEST REST CAMP DEHRADUN | ₹3.9 Cr+₹5.2 L (1.36%) | L2 | Rejected-AOC Rejected. |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per attached letter. |
Tender Value
₹4.5 Cr
EMD Value
₹9.1 L
Closing Date
17 Aug 2023, 3:00 pmClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Yamuna Colony, Dehradun
Construction of Cycle Track at Rajpur Kuthalgate SH-23 in Mussoorie Constituency of District Dehradun.
2023_pwd_61659_1
5162/1C-9/23, Dated 31-07-2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Rajpur Kuthalgate
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Pro. Division, PWD, Dehradun
₹9.1 L
Superintending Engineer, 9th Circle, PWD, Dehradun
15 Dec 2023
3 Aug 2023
17 Aug 2023
3 Aug 2023
17 Aug 2023
10 Aug 2023
9 Aug 2023
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material..
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross- ections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Disposal of surplus excavated Materials earth out of Municiple Limits as directed by the Engineer-in-charge of the work.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4)
By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Providing and laying 500x500x40 mm thick Turf paver (Turfpave XD) on 150 mm thick sub grade of compacted bed of 20 mm thick nominal size stone aggregate and base course and filling with 150 mm thick jamunasand, including spreading, well ramming, consolidating and finishing smooth etc. all complete as per direction of Engineer-in-charge.
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade pigment using white cement
Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of officer-in-charge
Supply & Fixing 3 Seater Cast Iron Bench including supply of all materials T & P etc. Complete.
Precasting and placing in position 125 mm dia Bollards 600 mm high of required shape including providing M.S. Pipe Sleeve 50 mm dia 300 mm long in the Bollard and M.S. Pipes 40 mm dia and 450mm long with 150x150x6mm M.S. plate welded at bottom and embedded 150mm in cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size), including necessary excavation of size 250x250x450mm deep for the same in bitumen/ concrete pavement at specified spacing.
M/S DOON INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .