Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15.2 L
EMD Value
₹15,500
Closing Date
30 Nov 2026, 6:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Office of the Chief Conservator of Forests, Marine National Park, Jamnagar
Construction of a Watchtower at Narara, Vadinar round of Sikka range of Marine National Park, Jamnagar
365811
MNP-10/2026-27
Open
Civil - All
Works
Jamnagar
17 documents required · 14 mandatory · 3 optional
₹900
Deputy Conservator of Forests, Marine National Park, Jamnagar
₹15,500
16 Nov 2026
16 Nov 2026
16 Nov 2026
30 Nov 2026
16 Nov 2026
120 days
Name of Work: Construction of a Watchtower at Narara, Vadinar round of Sikka range for Marine National
Sr. No. Description of Work Quantity Unit Rate (₹) Amount (₹)
Boring holes 3.5 m deep in ordinary soil (for cast in
situ piles) and getting out the soil and disposal of
1 the surplus excavated soil as directed within a lead 6.00 Each 1545.00
of 50 Meter for following diameter of pipes.(iii)
Add to or deduct from the rate for Bore Holes of
m Depth, if bore holes are made deeper or
shallower than 3.5M. for Piles of following
diameter.(iii) 300 mm
Load testing of foundation piles including loading
3 with necessary kentledge or any other suitable 4.80 MT 185.52
method as directed.
Providing and laying controlled cement concrete M-
4 250 for R.C.C. bored piles including ramming, 1.70 Cumt 4711.10
vibrating and finishing complete.
Providing and fixing in position Fe 500D TMT for
R.C.C. bored piles as per detailed drawing, including
5 cutting, bending hooking tying and welding 0.34 MT 72927.17
complete and including forming the cage and
lowering it in position. (up to 10 ton)
Providing and placing in position High yield strength
deformed bars for pile cap including cutting,
bending hooking, and tying complete as per
detailed drawing.
Providing and laying controlled cement concrete
M.250 and curing complete excluding the cost of
7 formwork and reinforcement for reinforced 15.00 Cumt. 4329.55
concrete work in (A) Pile Cap Foundations, footings,
Base of columns and Mass concrete.
Providing formwork of ordinary timber planking so
as to give a Exposed finish including centering
shuttering strutting and propping etc. Height of
8 propping and centering below supporting floor to 159.60 Sqmt 178.61
ceiling and removal of the same for in situ
reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and
Providing and laying controlled cement concrete
M.250 exposed work with curing etc. complete
including the cost of formwork but excluding the
cost of reinforcement for R.C.C. work in (A) BEAMS
for all floor :(ii) Having cross-sectional area more
than 0.08Sq.M and upto 0.12 Sq.M
Name of Work: Construction of a Watchtower at Narara, Vadinar round of Sikka range for Marine National
Sr. No. Description of Work Quantity Unit Rate (₹) Amount (₹)
Providing and laying controlled cement concrete
M.250 exposed work with curing etc. complete
including the cost of formwork but excluding the
10 cost of reinforcement for R.C.C. work in (B) 12.05 Cumt. 10163.67
COLUMNS for all floor : (iii) Having cross-sectional
area more than 0.12Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete
M.250 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in © Slabs, landing, shelves,
Balconies, Lintels, Beams, Girders and Cantilever
upto floor two level.
Providing and laying controlled cement concrete
M.250 and curing complete excluding the cost of
12 formwork and reinforcement for reinforced 6.23 Cumt 5621.60
concrete work in (E) Staircases excluding landing
upto floor two level
Providing formwork of ordinary timber planking so
as to give a rough finish including centering
shuttering strutting and propping etc. height of
propping and centering below supporting floor to
13 ceiling not exceeding 4 M. and removal of the same 60.60 Sqmt 253.03
for in situ reinforced concrete and plain concrete
work in. (M) Staircase with sloping or stepped
soffits including risers and stringers excluding
Applying general insecticide pest control treatment
to floors, cupboards etc including labour materials
etc. complete. Using Imidacloprid 30.5 SCas Per IS
14 6313 part -II( (0.075% concentration by mass) is 20.25 Sqmt 90.72
recommended 10.5ml chemical diluted with 5 liters
of water application 0.5 litre chemical /Sqm of
surface is recommended as per I.S.
Filling in foundation and plinth with murrum or
selected soil in layers of 20 cm. thickness including
watering, ramming and consolidating etc.
Providing TMT Bar FE 550D reinforcement for R.C.C.
16 work including bending, binding and placing in 6106.39 Kg 94.05
position complete upto floor two level
Name of Work: Construction of a Watchtower at Narara, Vadinar round of Sikka range for Marine National
Sr. No. Description of Work Quantity Unit Rate (₹) Amount (₹)
Brick work using common burnt clay building bricks
having crushing strength not less than
17 kg./Sq.Cm. in foundation and plinth in Cement 2.27 Cumt. 4203.06
Mortar 1:5. (1- Cement : 5 -fine sand)(B)
Extra for brick work in superstructure above plinth
level upto floor two level (B) Conventional
20mm thick sand faced cement plaster on walls
10 metres above ground level consisting of 12mm
19 thick 320.01 Sqmt. 312.56
backing coat of C.M. 1:3 (1-cement : 3-sand) and
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc.
P & L 24" x 24" vitrified 8 mm thick tile flooring over
20 mm (average) base of cement mortar 1:6 (
cement: 6 coarse sand) on new surface or fixing on
20 existing flooring by adhesive material including 24.75 Sqmt. 1453.19
dismentaling of existing flooring and jointed with
color cement slurry including finised with flush
pointing & cleaning the surface etc. complete for
Providing and laying polished Kota stone slab
flooring over 20mm (Average) thick base of cement
mortar 1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5
21 (1-Lime putty :1.5 - coarse sand) laid over and 24.75 Sqmt. 2173.03
jointed with grey cement slurry mixed with pigment
to match the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick
Providing and laying Rough kota stone slab 25mm
thick in risers of steps,skirting Dedo and pillars laid
on 10mm thick cement mortar 1:3 (1-Cement :
22 coarse sand) and jointed with gray cement slury 39.60 Sqmt. 1132.82
mixed with pigment to match the shade of slab
including rubbing and polishing etc. complete.
Name of Work: Construction of a Watchtower at Narara, Vadinar round of Sikka range for Marine National
Sr. No. Description of Work Quantity Unit Rate (₹) Amount (₹)
Providing and laying broken China Mosaic Flooring
for Terrace using 12mm to 20mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to
23 plain or slope and tempered to bring mortar crème 20.25 Sqmt. 771.98
out upto surface using white cement including
rounding off junctions and extending them up to
15cm along wall, clearing with water and oxalic acid
etc. as directed.
Providing and mixing Dr. Fixit water proofing
24 material in cement concrete in mix proportion 3.65 Lit/Kg. 48.67
recommended by the manufacturers.
Providing and laying cement concrete flooring 1:2:4
25 laid in one layer finished with a floating coat of neat 20.25 Sqmt. 335.72
cement (B) 50mm thick
Steel work, welded in built up sections framed work
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint. (A)In
26 beams and joists, channels angles Tees, flats, with 5.00 Qtl 9018.30
connecting plates or angle cleats as in main and
cross beams. Hip and jack rafters, purlins conneted
to common rafters and the like
Providing and applying anticarrasive treatment with
polymer base materials to the steel rainfarcement
including descaling the dust and applying the
preventive coating of approved make (for the R.C.C.
structures near coastal area only) etc complete.
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give required
28 shape/even shade after thoroughly brushing to 211.32 Sqmt. 119.07
remove dirt and loose powdered materials etc.
Total Amount Rs.
Total Amount Rs.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD_Narara_Watch Tower.pdf
2. Schedule_B.pdf
3. All GR.pdf
4. SPECIFICATION BOOKLET.pdf
5. NIT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .