Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical LT KUNJALAL BHUIYAN S N PALLY BELONIA SOUTH TRIPURA PIN 799155 | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BADARGHAT CHOWMUHANI AGARTALA TRIPURA WEST | AGARTALA | WEST TRIPURA | TRIPURA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical SIDDHI ASRAM AD NAGAR AGARTALA TRIPURA W PIN 799003 | AGARTALA | WEST TRIPURA | TRIPURA | 799003 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical DISPUR KAMRUP GUWAHATI ASSAM | GUWAHATI | KAMRUP | ASSAM | 781006 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AMARPUR NATUN BAZAAR AMARPUR GOMATI DISTRICT TRIPURA | AMARPUR | GOMATI | TRIPURA | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, TUDA
O/O THE EE TUDA 4th Floor UD Bhawan
3 nos Flood_Storm water discharge pump house and 1 no. vehicle mounted movable water pump machine for discharge of flood water under Belonia MC under SASCI 2025-26 Phase-I
2026_TUDA_78458_1
99_CE_CP_EE_TUDA_2026-27
Open Tender
Civil Works
Item Rate
365 days
Belonia
As per DNIeT
3 documents required · 3 mandatory
₹8,000
₹5.6 L
O/O THE EE TUDA 4th Floor UD Bhawan
12 Nov 2026
23 Oct 2026
12 Nov 2026
24 Oct 2026
12 Nov 2026
5 Nov 2026
24 Oct 2026 - 2 Nov 2026
2 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule No. 1: Civil Works | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the
periphery of the area cleared. | 120 | Sqm | - | - |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 12.56 | Cum | - | - |
| 1.03 | B. With dewatering.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
I Ordinary Soil
(i) Upto 3 m depth | 991.98 | Cum | - | - |
| 1.04 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 16.26 | Cum | - | - |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 334.85 | Cum | - | - |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate
20 mm nominal size) | 15.45 | Cum | - | - |
| 1.07 | Providing and laying in position ready mixed concrete manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC from transit mixer to site of laying but excluding the cost of centring, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per the direction of Engineer-in-Charge.
(Note :- Cement content considered in this item is @ 418 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
All works upto plinth level
Reinforced cement concrete grade M-25 using 418 kg of cement per cum | 137.49 | Cum | - | - |
| 1.08 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 19,406.88 | Kg | - | - |
| 1.09 | Centering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns etc. for mass concrete with timber plank | 58.07 | Sqm | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
DNIeT.pdf
Tender Documents • 5.08 MB
BOQ_79870.xls
BOQ • 0.46 MB
DNIeT_2.pdf
PDF • 5.32 MB
DNIeT_2.pdf
PDF • 3.88 MB
2026_TUDA_78458_1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .