| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹1.4 L (0.83%)Admitted-Finance | ₹1.6 Cr+₹1.4 L (0.83%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical TANAKPUR ROAD PITHORAGARH UTTARAKHAND | - | - | Rejected-Technical Non responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
| Sl No | Description | Qty | Unit | Bharat Bhushan Singh L2 | Basant Bhallabh Punetha L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 279.23 | CUM | 300 ₹83,769 Lowest | 390 ₹1,08,899.7 |
| 2.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specificationsClause 802, 803, 1202 & 1203 of MORD Specifiction | 408.38 | CUM | 4,800 ₹19,60,224 | 4,050 ₹16,53,939 Lowest |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORDSpecifiction | 516.38 | CUM | 3,500 ₹18,07,330 Lowest | 3,550 ₹18,33,149 |
| 4.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 565.39 | CUM | 2,000 ₹11,30,780 Lowest | 2,000 ₹11,30,780 Lowest |
| 5.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (Asper PWD Uttarakhand specifications | 217.35 | CUM | 500 ₹1,08,675 Lowest | 900 ₹1,95,615 |
| 6.00 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203...Nominal mix 1:3:6 | 102.4 | CUM | 6,000 ₹6,14,400 Lowest | 6,500 ₹6,65,600 |
| 7.00 | Providing concrete for Plain cement concrete in sub-structure complete as per drawing and technical specifications clause 802, 803, 1202 & 1203. PCC(1:1.5:3) MoRTH | 51.2 | CUM | 8,000 ₹4,09,600 Lowest | 8,800 ₹4,50,560 |
| 8.00 | Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge. | 856.67 | CUM | 40 ₹34,266.8 Lowest | 65 ₹55,683.55 |
| 9.00 | Cleaning of fully choked scupper and catchpit complete as directed by theEngineer-in-charge. | 8 | Nos | 2,000 ₹16,000 Lowest | 3,200 ₹25,600 |
| 10.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means | 494.99 | CUM | 2,200 ₹10,88,978 Lowest | 2,300 ₹11,38,477 |
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
11 Oct 2023, 3:00 pmClosed
SE 3rd Circle PWD Pithoragarh
SE 3rd Circle PWD Pithoragarh
One time maintenance work of Bansbagad Guthi motor road constructed by PMGSY Dharchula (Length 9.00 km)
2023_pwd_63346_2
5128/58C-03(YataB)/2023 Dated 04-09-2023
Open Tender
Civil Works - Roads
Item Rate
270 days
Didihat
As per bid documents
3 documents required · 3 mandatory
₹5,900
EE PD PWD Didihat
₹3.7 L
SE 3rd Circle PWD Pithoragarh
3 Nov 2023
13 Sept 2023
11 Oct 2023
13 Sept 2023
11 Oct 2023
13 Sept 2023
20 Sept 2023
Amount
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specificationsClause 802, 803, 1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORDSpecifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (Asper PWD Uttarakhand specifications
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203...Nominal mix 1:3:6
Providing concrete for Plain cement concrete in sub-structure complete as per drawing and technical specifications clause 802, 803, 1202 & 1203. PCC(1:1.5:3) MoRTH
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Cleaning of fully choked scupper and catchpit complete as directed by theEngineer-in-charge.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means
Tack coat using VG-10 grade bitumen..Over dry and hungry bituminous surfaces @0.40 kg/sqm
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity,finished to required level and grades to be followed by seal coat of either Type B as per Technical Specification Clause 508.Bitumen (VG-10)Manual Means
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25m) as per Technical Specification Clause 307.Mechanical Means
Bharat Bhushan Singh
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .