Tender Value
₹1.9 L
EMD Value
₹3,781
Closing Date
16 Mar 2026, 6:55 pmClosed
Chairman
Baduria Municipality
CONSTRUCTION OF PROTECTION WALL. Start from Main Road to Colony More in ward no. 12
2026_MAD_1018939_5
BM/NIT/E-724
Open Tender
CIVIL WORKS
Percentage
90 days
Baduria
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,781
Yes
25 Aug 2026
7 Mar 2026
19 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation of foundation trenches or drains ,in all sorts of soil ( including mixed soil but excluding lateric or sand stone)including removing spreading or stacking the soils within a lead of 75m as directed . The item includes necessary training the sides of trenches, leveling ,dressing and ramming the bottom, bailing out water etc.as required complete.
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiringP-1,
It-2/a | 19.5 | % m3 | 11,927 | ₹2,32,576.5 |
| 1.02 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 150mincluding watering and ramming etc. with earth obtained from excavation of foundation.
i) From Excavation
P-1,
It-3/a | 3.9 | %m3 | 7,754 | ₹30,240.6 |
| 1.03 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)P-2
It-4A | 3 | %m3 | 93,621 | ₹2,80,863 |
| 1.04 | Single brick flat solling of picked jhama bricks including ramming and dressing bed to proper level, and or local sand.
P-14, Sl.-1 | 20 | m2 | 361 | ₹7,220 |
| 1.05 | Cement concrete with Graded Stone balast (40 mm size) excluding shuttering. In Ground floor and foundation. (a) 6:3:1 proportion
P-9,
It-26 | 3 | m3 | 5,248.44 | ₹15,745.32 |
| 1.06 | Brick work with 1st class bricks in cement mortar (6:1) (a) In foundation and plinth
P-1,
It-4/a | 20.45 | m3 | 5,567.81 | ₹1,13,861.71 |
| 1.07 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding
i) 15 mm thick (6:1)
P-189,
It-1/ii/b | 28 | m2 | 148.71 | ₹4,163.88 |
| 1.08 | Neat cement punning about 1.5 mm thick in wall dado, window, sills, floor, drain etc.
P-192,
It-15 | 28 | m2 | 32.85 | ₹919.8 |
| 1.09 | Earth work in filling in foundation trenches or
plinth with good earth, in layers not exceeding
150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on
the basis of measurement of finished quantity of
work)
(i) With carried earth arranged by the
contractor within a radius of 1 km. including cost
of carried earth.
P-1, Sl.-3/c | 36 | % m3 | 31,271 | ₹11,25,756 |
| 1.1 | Add 18 % GST | 1 | Nos | 28,548.91 | ₹28,548.91 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.06 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2503771.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .