Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
3 May 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM CCnPHS
DGM CCnPHS MES DEPT, RCF TROMBAY, CHEMBUR MUMBAI
Miscellaneous Maintenance jobs of Critical Equipments in Suphala Plant
2022_RCFL_683490_1
ET - MES/207/L/2122/457
Open Tender
Miscellaneous Services
Works
720 days
MES DEPT, RCF TROMBAY, CHEMBUR MUMBAI
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹20,000
Yes
11 Jun 2022
12 Apr 2022
3 May 2022
12 Apr 2022
3 May 2022
12 Apr 2022
120 days
Amount
A) RA/RB/DRA/DRB Bucket Elevators
Bottom boot cover opening and boxing up
Inspection windows opening & boxing up
Shear pin replacement
Multi-disc/Resilient plate of Fluid coupling replacement
Replacement of bottom sprocket sealing arrangement(both sides)
Replacement of backstop lever with pin
B) RA/RB/DRA/DRB fines, RHS/DBN CPC, K-1,K-2, D-1,D-2, NP-0,NP-7, NP-8 conveyors
Replacement / Chain shortening of Drive chain
Replacement of drive/driven sprocket
Replacement of Pulley bearing assembly
Greasing of Pulley bearing (02 nos.)
Replacement / Inspection of Grid member of coupling
Replacement of coupling & alignment
Replacement of Tie-rods (02 nos.) of Tail end pulley
Replacement of Belt scrapper
Removal of Belt off-centre
C) RHS/DBN Spherodizers
Replacement of nozzle cup/Spray gun assembly
Replacement/ tightening of pulley ‘ V ‘ Belt
Gearbox Pulley replacement
Replacement of Girth gear bolts
Gearbox bearing inspection
Replacement/ tightening of gearbox & motor foundation bolts
Replacement / Inspection of grid member of coupling of gearbox
Bearing inspection/ greasing of Plummer blocks of trunion roller
D) RHS/DBN Cooler /Coater
Replacement / Inspection of grid member of coupling
Replacement of coupling & alignment
Alignment of motor & gearbox
Replacement of Girth gear bolts
Replacement/ tightening of gearbox & motor foundation bolts
Gearbox bearing inspection
Bearing inspection/ greasing of Plummer blocks of trunion roller
E) DC-201/202/203/204/205/206 Reactors / Tanks
Replacement of outlet valves Size : 5”
Replacement of outlet valves Size : 4”
Replacement of ‘ V ‘ belts of DC-205/206 tanks
Strainer opening & box up of DC-205/206 tanks
Replacement/ tightening of Foundation bolts of gearbox
Replacement/ tightening of Coupling bolts
Replacement of Lovejoy coupling pads of GD-211/214
Replacement of Lovejoy coupling pads of GD-212/213
Replacement/ tightening of intermediate flange bolts of GD-211/214
F) RA/RB/DRA/DRB, LA, GB-721/723, GB 622/622 A Exhausters
Replacement / Inspection of Grid member of coupling
Alignment of motor & rotor
Inspection windows opening & boxing up
Suction/Discharge damper servicing in position
Bearing inspection (02 nos.) / clearance checking
Insitu Balancing of rotor assembly (with PHS dept.)
Foundation bolts tightening
Descaling rotor of fume exhauster
G) RHS/DBN Furnace Fan
Replacement / Inspection of Grid member of coupling
Replacement of coupling & alignment
Alignment of motor & rotor
Inspection windows opening & boxing up
Insitu Balancing of rotor assembly (with PHS dept.)
Foundation bolts tightening
H) Slurry spray, Slurry transfer, Scrubbing Pumps
Replacement / Inspection of Grid member of coupling
Replacement of coupling & alignment
Two dial alignment of pump
Replacement of discharge ‘ NRV ‘
Replacement of Butterfly Valve Size : 10”
Replacement of Butterfly valve Size : 8 “
Replacement of Butterfly Valve Size : 6”
3”/4” Slurry line flanges opening & box-up for cleaning job
I) RHS/DBN Product, RHS/DBN CPC, Rock Screen Vibrators
Replacement/Repair of vibrator assembly complete
Replacement of Bottom stand post
Replacement/tightening of stand post bolts
Replacement of tie-rod with bush
J) CPT-1 /2, CPT-5/6 compressor
Replacement of ‘ V ‘ Belt CPT 1/2
Replacement of ‘ V ‘ Belt CPT 5/6
Replacement of After-cooler / Intercooler
Repairing / Hydro-testing of After-cooler / Intercooler
K) RHS/DBN Cyclones
Replacement of Rubber flapper
Fabrication/ replacement of Cyclone bottom cone with rubber flapper
Replacement of Cyclone chain
Mepico Fabricators
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .