Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAccepted-AOC | ₹7.2 Cr Quoted ₹8.5 Cr | L1 | Accepted-AOC Award to L1 |
| 2 | L2₹8.5 Cr+₹4.4 L (0.52%)Rejected-Finance V P O LOTE TEHSIL DISTT LAHAUL DISTT LAHAUL SPITI H P 175133 | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹8.5 Cr+₹4.4 L (0.52%) | L2 | Rejected-Finance Found L2 |
| 3 | L3₹8.7 Cr+₹15.2 L (1.79%)Rejected-Finance NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 176001 | ₹8.7 Cr+₹15.2 L (1.79%) | L3 | Rejected-Finance Found L3 |
| Sl No | Description | Qty | Unit | SEWA SINGH L1 | Shadil Thakur L3 | JOGINDER SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearance of silt/malwa from channel including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mtr complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 21.6 | Cum | 350 ₹7,560 | 350 ₹7,560 | 340 ₹7,344 Lowest |
| 2.00 | Cutting in earth work and disposal of excavated earth upto all leads and lift complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 15.6 | Cum | 280 ₹4,368 | 280 ₹4,368 | 270 ₹4,212 Lowest |
| 3.00 | Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 2.67 | Cum | 1,850 ₹4,939.5 | 1,900 ₹5,073 | 1,800 ₹4,806 Lowest |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 430.96 | Cum | 410 ₹1,76,693.6 Lowest | 470 ₹2,02,551.2 | 450 ₹1,93,932 |
| 5.00Centering and shuttering including strutting, propping etc. and removal of form work for : | ||||||
| 5.01 | Foundation, Footings, Bases of column etc. complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 28.92 | Sqm | 340 ₹9,832.8 Lowest | 350 ₹10,122 | 345 ₹9,977.4 |
| 5.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 29.62 | Sqm | 380 ₹11,255.6 Lowest | 400 ₹11,848 | 390 ₹11,551.8 |
| 5.03 | Edges of slabs and breaks in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 9.7 | Rmt | 60 ₹582 Lowest | 70 ₹679 | 65 ₹630.5 |
| 5.04 | Suspended floors, roofs, landing, balconies and access platform, complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 3.93 | Sqm | 500 ₹1,965 | 525 ₹2,063.25 | 495 ₹1,945.35 Lowest |
| 6.00Extra Allowance for formwork in concrete lining in: | ||||||
Tender Value
₹5.7 Cr
EMD Value
₹6.0 L
Closing Date
9 Jul 2025, 5:00 pmClosed
District Project Manager HPCDP JICA ODA
District Project Manager O/o DPMU HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
Improvement of Flow Irrigation Scheme Kamed Kuhal, FIS Bhaddul Kuhal, FIS Triambla Ola to Abbad Nala, FIS Amboti, FIS Bathera and Lag Suanta, FIS Papahan, LIS Nana Khas and LIS Banoli Khas.
2025_HPCDP_109286_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022-1036
Open Tender
Civil Works
Item Rate
365 days
Jawali, Dharamshala
Please refer Tender documents.
17 documents required · 17 mandatory
₹5,000
District Project Manager HPCDP JICA ODA
₹6.0 L
District Project Manager HPCDP JICA ODA
1 Jul 2026
3 Jul 2025
10 Jul 2025
3 Jul 2025
9 Jul 2025
3 Jul 2025
5 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearance of silt/malwa from channel including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mtr complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 2Cutting in earth work and disposal of excavated earth upto all leads and lift complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 3Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 4Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||
| 5.01 | Foundation, Footings, Bases of column etc. complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | - | Sqm | - | - |
| 5.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | - | Sqm | - | - |
| 5.03 | Edges of slabs and breaks in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | - | Rmt | - | - |
| 5.04 | Suspended floors, roofs, landing, balconies and access platform, complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | - | Sqm | - | - |
| 6Extra Allowance for formwork in concrete lining in: | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_159648.xls
BOQ • 0.53 MB
174699840.pdf
Tender Documents • 1.02 MB
174699842.html
Tender Documents • 0.08 MB
ClustterI.pdf
Tender Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .