| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.7 LAccepted-AOC 107 265 BRAHAMA NAGAR KANPUR UP 208012 | KANPUR NAGAR | UTTAR PRADESH | 208012 | ₹62.7 L | L1 | Accepted-AOC Being L1 bidder |
| 2 | L2₹64.9 L+₹2.2 L (3.54%)Rejected-AOC 12 BHARTI AARTIST COLONY VIKAS MARG NEW DELHI 110092 | EAST | DELHI | 110092 | ₹64.9 L+₹2.2 L (3.54%) | L2 | Rejected-AOC Being L2 bidder |
| 3 | L3₹93.1 L+₹30.4 L (48.5%)Rejected-AOC 24 PARAGANAS NORTH BELGERIA KOLKATA 700056 WEST BENGAL KOLKATA WEST BENGAL 700056 | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | ₹93.1 L+₹30.4 L (48.5%) | L3 | Rejected-AOC Being L3 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not meets the NIT criteria. |
| 5 | Rejected-Technical B 814 8TH FLOOR B G TOWER OPP DELHI GATE SHAHIBAUG ROAD AHMEDABAD 380004 | AHMADABAD | GUJARAT | 380004 | - | - | Rejected-Technical Not meets the NIT criteria. |
Tender Value
₹72.1 L
EMD Value
₹1.4 L
Closing Date
15 Nov 2022, 6:00 pmClosed
AGM(E-E), AAI,CA,Vadodara
AGM(E-E), Airports Authority of India, Vadodara Airport, Vadodara-390022
Replacement of Old Transformers at CA, Vadodara.
2022_AAI_132953_1
AAI/BO/EE/NIT-6/TRF/2022-23
Open Tender
Electrical Works
Works
150 days
VADODARA AIRPORT
Please refer Tender documents.
17 documents required · 17 mandatory
₹1,180
₹1.4 L
1 Aug 2023
22 Oct 2022
17 Nov 2022
22 Oct 2022
15 Nov 2022
22 Oct 2022
22 Oct 2022 - 11 Nov 2022
Amount
Supplying, Installation, Testing & commissioning of 1600 KVA (Oil type Distribution transformer) 11KV / .433KV, Dyn11, 3phase 50Hz, IP 55, copper wound, Oil type step down transformer ONAN Mineral oil as per IS:335 i/c oil complete with all modern fittings as required including lifting lugs, Roller type bi-directional wheels,cable end box on HV side suitable for 3C X 240 Sqmm XLPE cable of 11KV grade including Cable termination to transformer and suitable busduct (2500Amps.) connection arrangement on LV side including Bus Duct modification (adding or/ and subtracting of Bus Duct) as per site condition, disconnecting chamber on both sides, winding temprature indication with alarm trip contacts, bucholz relay, earthing terminals, diagram and rating plates, explosion vent, OFF load tap changer (+7.5% to -7.5%) @ of 2.5% steps etc. complete as required. First filling of filtered dehyderated transformer oil and with topping quantities of oil to be supplied separately. Testing of oil before and after commissioning & also if filteration required is included in the scope. Losses, % Impedance and all other parameters complied with as per IS :1180 with upto date amendments, tender specifications etc complete as per site requirement.The warrantee of equipment shall be one year from certified date of the work completion.
Dismantling, loading, unloading and Transportation of 1500 KVA, 11 KV/433 volt Distribution Transformer (oil type) along with all accessories within Vadodara Airport premises , location as per instruction by EIC, including hiring charges of heavy T & P such as crane/hydra, lorry etc. along with labour and incidental charges and local taxes etc (if any) complete as per site requirement.
VIJAYPOWER GENERATORS LIMITED
TEXMACO RAIL AND ENGINEERING LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .