Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | ₹1.6 L | 1 | Accepted-AOC AEE/LIDEW-DIV/MPM/009/26-27 |
| Sl No | Description | Qty | Unit | RAFEEQUE U P L1 |
|---|---|---|---|---|
| 1.00Kulam maintanance | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 297.5 | cum | 209.98 ₹62,469.05 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 30 | hour | 279.24 ₹8,377.20 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1.1 | cum | 7,839.91 ₹8,623.90 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 99 | kilogram | 96.45 ₹9,548.55 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.4 | sqm | 328.98 ₹1,447.51 |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 5.6 | cum | 7,769.51 ₹43,540.33 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 59.93 | sqm | 308.18 ₹18,469.23 |
| 1.01 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 59.93 | sqm | 190.22 ₹11,399.88 |
Tender Value
₹1.7 L
EMD Value
₹4,202
Closing Date
20 Sept 2025, 6:55 pmClosed
ASSISTANT EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP (2024-25), Project No 45-25 -Renovation Of Ramanchina Kulam - Kannamangalam-General Civil Work (Retender)
2025_LSGD_795921_1
DB1/TN/AEE/27/25-26
Open Tender
Civil Works - Canal
365 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
₹4,202
Yes
19 Jun 2026
12 Sept 2025
22 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
Amount
Kulam maintanance
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Bidder Name
RAFEEQUE U P
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1316734.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid