Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 Cr+₹20.2 L (20.4%)Admitted-Finance C 75 SECTOR 10 NOIDA KANOLI SECTOR 10 SECTOR 10 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L2 | Admitted-Finance | |
| 3 | L3₹1.9 Cr+₹94.7 L (95.6%)Admitted-Finance 37 INTEC HOUSE SECTOR 44 INSTITUTIONAL AREA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical B3 3 ORCHID HOMES 6 MUNUSAMI STREET GANAPATHIPURAM CHENNAI TAMILNADU KANCHIPURAM TAMIL NADU 600064 | CHENGALPATTU | TAMIL NADU | 600064 | - | Rejected-Technical Techno-commercially not acceptable |
| Sl No | Description | Qty | Unit | Tractebel Engineering Private Ltd L3 | POSITRON ENERGY PRIVATE LIMITED L1 | Resonance Energy Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Charges for Construction supervision, inspection, project management services and pre- commissioning / commissioning (1 man-month = 26 days); however these are to be paid at actual which also includes the office arrangements, to & fro ticket, accommodation and local transport (minimum one four wheeler/2 person) etc. | ||||||
| 1.01 | PMC – Project Manager | 24 | Man- Month | 1,56,520 ₹44,32,646.4 | 1,19,599 ₹33,87,043.68 | 1,04,000 ₹29,45,280 Lowest |
| 1.02 | PMC - Site Engineer | 120 | Man- Month | 1,05,510 ₹1,49,40,216 | 46,009 ₹65,14,874.4 Lowest | 63,400 ₹89,77,440 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
28 Feb 2023, 3:00 pmClosed
CHIEF MANAGER (CP)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
Tender for Rate Contract for a period of 2 years for hiring of Project Management Consultant services for steel pipeline laying and associated works for CGD Network of Pune GA
2023_MNGL_144481_1
MNGL/CP/2022-23/197
Open Tender
Consultancy
Works
710 days
Pune
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹2 L
Yes
MNGL, Baner, Pune
23 Mar 2023
7 Feb 2023
1 Mar 2023
7 Feb 2023
28 Feb 2023
7 Feb 2023
14 Feb 2023
Amount
Charges for Construction supervision, inspection, project management services and pre- commissioning / commissioning (1 man-month = 26 days); however these are to be paid at actual which also includes the office arrangements, to & fro ticket, accommodation and local transport (minimum one four wheeler/2 person) etc.
PMC – Project Manager
PMC - Site Engineer
Resonance Energy Private Limited
Tractebel Engineering Private Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .