| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC SHANTI COTTAGE BELOW PASSPORT OFFICE PANTHAGHATI SHIMLA DISTT SHIMLA HP | SHIMLA | SHIMLA | HP | 171009 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹13.0 L+₹11,270.14 (0.88%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | L2 | Rejected-Finance not a lowest bidder | |
| 3 | L3₹14.3 L+₹1.4 L (10.7%)Rejected-Finance | L3 | Rejected-Finance not a lowest bidder | |
| 4 | L4₹14.3 L+₹1.5 L (11.4%)Rejected-Finance | L4 | Rejected-Finance not a lowest bidder | |
| 5 | L5₹14.4 L+₹1.5 L (12.0%)Rejected-Finance | L5 | Rejected-Finance not a lowest bidder |
| Sl No | Description | Qty | Unit | Saddam Engineering L2 | MANOJ BHARDWAJ L6 | SANJEEV GUPTA L10 | saurabh sharma L1 | Chaman Lal Contractor L8 | MOHAN LAL L9 | RAO ELECTRONICS L4 | AHMED HASAN L5 | M/s BHAWAN SINGH L3 | Deepak Kumar Contractor L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 151.47 | Per cum | 295 ₹44,683.65 | 110 ₹16,661.7 Lowest | 240 ₹36,352.8 | 167 ₹25,295.49 | 195 ₹29,536.65 | 192 ₹29,082.24 | 200 ₹30,294 | 120.17 ₹18,202.15 | 210 ₹31,808.7 | 180 ₹27,264.6 |
| 2.00 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) :4 graded stone aggregate 20 mm nominal size) .including of hauling of material in all leads,lifts as per the entire satsfaction and direction of Engineer in charge. | 105.19 | Per cum | 4,190 ₹4,40,746.1 | 6,100 ₹6,41,659 | 4,800 ₹5,04,912 | 4,287 ₹4,50,949.53 | 5,750 ₹6,04,842.5 | 5,850 ₹6,15,361.5 | 5,000 ₹5,25,950 | 4,800.17 ₹5,04,929.88 | 4,000 ₹4,20,760 Lowest | 5,600 ₹5,89,064 |
| 3.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. including of hauling of material in all leads,lifts as per the entire satsfaction and direction of Engineer in charge. | 8,695.5 | Per kg | 89 ₹7,73,899.5 | 98 ₹8,52,159 | 105 ₹9,13,027.5 | 86.87 ₹7,55,378.09 | 106 ₹9,21,723 | 107 ₹9,30,418.5 | 88 ₹7,65,204 | 99.17 ₹8,62,332.74 | 70 ₹6,08,685 Lowest | 105 ₹9,13,027.5 |
| 4.00 | Supply and fixing galavanised steel barbed wire (Is :278 - 1962 type -1 , provided with orizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing
9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. | 2,800 | Per rmt | 14 ₹39,200 Lowest | 15 ₹42,000 | 99 ₹2,77,200 | 19.87 ₹55,636 | 22 ₹61,600 | 21 ₹58,800 | 40 ₹1,12,000 | 20.17 ₹56,476 | 130 ₹3,64,000 | 19 ₹53,200 |
Tender Value
₹16.3 L
EMD Value
₹49,000
Closing Date
22 Dec 2025, 5:00 pmClosed
Deputy Director of Agriculture Sirmour at Nahan
Deputy Director of Agriculture Sirmour at Nahan
As Above
2025_DoA_123311_1
6087 dt 26-11-2025
Open Tender
Civil Works
Item Rate
30 days
Nahan
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Deputy Director of Agriculture Sirmour at Nahan
₹49,000
7 Jan 2026
12 Dec 2025
23 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) :4 graded stone aggregate 20 mm nominal size) .including of hauling of material in all leads,lifts as per the entire satsfaction and direction of Engineer in charge.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. including of hauling of material in all leads,lifts as per the entire satsfaction and direction of Engineer in charge.
Supply and fixing galavanised steel barbed wire (Is :278 - 1962 type -1 , provided with orizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
Saddam Engineering (BID ID -599877)
M/s BHAWAN SINGH (BID ID -600381)
RAO ELECTRONICS (BID ID -600096)
AHMED HASAN (BID ID -600469)
MANOJ BHARDWAJ (BID ID -600211)
Deepak Kumar Contractor (BID ID -600040)
Chaman Lal Contractor (BID ID -599938)
MOHAN LAL (BID ID -600346)
SANJEEV GUPTA (BID ID -600369)
stage.html
html • 0.08 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_181139.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .