Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC L1 Party |
| Sl No | Description | Qty | Unit | M ABDULSHUKKOOR L1 |
|---|---|---|---|---|
| 1.001m to 2m wide canal | ||||
| 1.01 | Removing/clearing vegetation/over growth /sludge deposit from 1.00m to 2.00m wide canal manually/mechanically (Safety of plumbing line and electrical cables should be ensured) and dispose them 1km lead as directed by Engineer- in -charge,
including machinery, all labours, tool, tackles, safety apparels etc and clearing mouth of inlet to canal ensuring unhindered flow through canal. | 634 | RM | 87 ₹55,158 Lowest |
| 2.004.5 m wide canal | ||||
| 2.01 | Removing/clearing vegetation/over growth /sludge deposit from 4.5 m wide canal in front of Admin building manually /mechanically(Safety of plumbing line and electric cables should be ensured) and dispose them 1km lead as directed by Engineer-incharge,including machinery,all labours,tool,tackles,safety apparels etc and clearin mouth of inlet to canal ensuring unhindered flow through canal. | 45 | RM | 242 ₹10,890 Lowest |
| 3.0010 m wide canal | ||||
| 3.01 | Removing/clearing vegetation/over growth/sludge deposit from 10 m wide canal (south of pigment store) manually /mechanically(Safety of plumbing line and electric cables should be ensured) and dispose them 1km lead as directed by Engineer-incharge,including machinery,all labours,tool,tackles,safety apparels etc and clearing mouth of inlet to canal ensuring unhindered flow through canal. | 473 | RM | 547 ₹2,58,731 Lowest |
| 4.003m wide canal | ||||
| 4.01 | Removing/clearing vegetation/over growth /sludge deposit from 3 m wide canal (West of ARP and adjacent to ETP pond) manually /mechanically(Safety of plumbing
line and electric cables should be ensured) and dispose them 1km lead as directed by
Engineer-in-charge, including machinery, all labours, tool, tackles, safety apparels
etc. and clearing mouth of inlet to canal ensuring unhindered flow through canal. | 339.5 | RM | 160 ₹54,320 Lowest |
| 5.00Miscellaneous labour for clearing the highway side canal blockage if any | ||||
| 5.01 | Miscellaneous labour for clearing the highway side canal blockage if any | 20 | Day | 1,000 ₹20,000 Lowest |
Tender Value
₹3.6 L
EMD Value
₹9,010
Closing Date
5 May 2026, 3:00 pmClosed
HOD(C/Pj)
KMML, CHAVARA
Clearing storm water canals and connected natural drains within company premises 2026. This work includes Removing Vegetation/overgrowth /sludges dispose etc from drainages
2026_KMML_848525_1
EAF/CIV/1379/2025-2026 dtd 26/03/2026
Open Tender
Civil Works - Others
Item Rate
30 days
KMML, CHAVARA
Refer Tender Documents
6 documents required · 6 mandatory
₹860
₹9,010
20 Jul 2026
20 Apr 2026
6 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11m to 2m wide canal | |||||
| 1.01 | Removing/clearing vegetation/over growth /sludge deposit from 1.00m to 2.00m wide canal manually/mechanically (Safety of plumbing line and electrical cables should be ensured) and dispose them 1km lead as directed by Engineer- in -charge,
including machinery, all labours, tool, tackles, safety apparels etc and clearing mouth of inlet to canal ensuring unhindered flow through canal. | - | RM | - | - |
| 24.5 m wide canal | |||||
| 2.01 | Removing/clearing vegetation/over growth /sludge deposit from 4.5 m wide canal in front of Admin building manually /mechanically(Safety of plumbing line and electric cables should be ensured) and dispose them 1km lead as directed by Engineer-incharge,including machinery,all labours,tool,tackles,safety apparels etc and clearin mouth of inlet to canal ensuring unhindered flow through canal. | - | RM | - | - |
| 310 m wide canal | |||||
| 3.01 | Removing/clearing vegetation/over growth/sludge deposit from 10 m wide canal (south of pigment store) manually /mechanically(Safety of plumbing line and electric cables should be ensured) and dispose them 1km lead as directed by Engineer-incharge,including machinery,all labours,tool,tackles,safety apparels etc and clearing mouth of inlet to canal ensuring unhindered flow through canal. | - | RM | - | - |
| 43m wide canal | |||||
| 4.01 | Removing/clearing vegetation/over growth /sludge deposit from 3 m wide canal (West of ARP and adjacent to ETP pond) manually /mechanically(Safety of plumbing
line and electric cables should be ensured) and dispose them 1km lead as directed by
Engineer-in-charge, including machinery, all labours, tool, tackles, safety apparels
etc. and clearing mouth of inlet to canal ensuring unhindered flow through canal. | - | RM | - | - |
| 5Miscellaneous labour for clearing the highway side canal blockage if any | |||||
| 5.01 | Miscellaneous labour for clearing the highway side canal blockage if any | - | Day | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1434135.xls
BOQ • 0.31 MB
TD.pdf
Tender Documents • 5.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].