Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.2 LAdmitted-Fee/PreQual/Technical/Finance AT PO BAZARPADA DHARAMGARH KALAHANDI 766015 ODISHA INDIA | KALAHANDI | ODISHA | 766015 | -1.00% | ₹38.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹39.2 L+₹1.0 L (2.63%)Admitted-Fee/PreQual/Technical/Finance | +1.60% | ₹39.2 L+₹1.0 L (2.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.6 L
EMD Value
₹38,561
Closing Date
17 Aug 2026, 5:00 pmClosed
Divisional Officer
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARAGADA, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARAGADA
BUILDING WORK (CIVIL )
2026_EICCL_137798_1
IFB-SE PWD BGH No.05 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
AMBABHONA
2 documents required · 2 mandatory
₹6,000
₹38,561
Yes
18 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
4 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1) | 204.08 | cum | 235.74 | ₹48,109.82 |
| 2 | Supplying & filling in foundation & Plinth with sand well watered & rammed including cost of all charges e.t.c. all complete. | 160.27 | cum | 774.18 | ₹1,24,077.83 |
| 3 | Providing plain cement concrete (1:3:6) in foundation & plinth using 40mm size cbhg metal including cost of all charges e.t.c. all complete. | 38.77 | cum | 6,282.72 | ₹2,43,581.05 |
| 4 | Fly Ash Brick masonary in cement mortar (1:6) on foundation & plinth including cost of all charges e.t.c. all complete. | 29.07 | cum | 5,897.09 | ₹1,71,428.41 |
| 5 | R.C.C. work of M-20 grade using 12mm to 20mm size CBHG chips including cost of all charges e.t.c. all complete. Column Base & Footing | 39.74 | cum | 6,557.49 | ₹2,60,594.65 |
| 6 | Plinth Beam | 20.22 | cum | 7,430.98 | ₹1,50,254.42 |
| 7 | Column in superstructure | 21.75 | cum | 18,371.43 | ₹3,99,578.6 |
| 8 | Straightening, cutting, bending, binding, tying the grills & placing in position for R.C.C. work including cost of all charges e.t.c. all complete. | 76.55 | qtl | 8,967.53 | ₹6,86,464.42 |
| 9 | Fly Ash Brick Masonary in Cement Mortar (1:6) on Superstructure including cost of all charges e.t.c. all complete. | 113.92 | cum | 5,930.42 | ₹6,75,593.45 |
| 10 | Providing 12mm thick Cement Plaster (1:6) over brick works including cost of all charges e.t.c. all complete. | 744.15 | sqm | 194.84 | ₹1,44,990.19 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.86 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_604460.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .