Loading…
Loading…
Tender Value
₹20.6 L
EMD Value
₹41,234
Closing Date
2 May 2026, 3:00 pmClosed
Executive Engineer, Div-III, AMC
O/O the Executive Engineer, Div-III, AMC
Construction of C.C road from H.O Rajib Roy to H.O Rachindra Nama, under ward NO 49 AMC.
2026_SAMC_72200_1
01/EE/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
Under ward No 49 AMC.
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹41,234
Yes
25 Aug 2026
27 Apr 2026
4 May 2026
27 Apr 2026
2 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in foundation frenches or drains not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead of 50 m All kind of soi | 73.53 | cum | 231.6 | ₹17,029.55 |
| 2 | Supplying and filling in plinth under floor foundation etc with snd fine from local quarry with all lift includingspreading in horizontal layer watering gradng to required slop ramming consolidating and compacting each layer by usingplate compactor or by any suitable method complete. | 70.04 | cum | 1,177.3 | ₹82,461.04 |
| 3 | Providing and laying dry flat brick flooring in required pattern completed. | 162 | sqm | 701.2 | ₹1,13,594.4 |
| 4 | Providing and laying in position cement concrete of specified grde excluding the cost of centering and shuttering All work upto plinth level 1:3:6( 1cement:3 fine sand:6 geded well burnt brick aggregate 20 mm niminal size) | 1 | cum | 9,938.6 | ₹9,937.61 |
| 5 | First class brick work foundation and pinth including cost of all materials as required complete In cement mortr 1:4(1cement:4 fine sand) | 0.44 | cum | - | - |
| 6 | Half brick first class brick work foundation and pinth including cost of all materials as required complete In cement mortr 1:4(1cement:4 fine sand) | 149.75 | sqm | 1,311.8 | ₹1,96,442.05 |
| 7 | 12 mm cement plaster of mix In cement mortar 1:4(1cement:4 fine sand) including Neat cement punning) | 221.75 | sqm | 281 | ₹62,311.75 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement All work upto plinth level 1:1.5:3(1cement:1.5 fine sand:3 grded stone aggregate 20 mm nominal size) | - | sqm | 12,073.8 | - |
| 9 | Reinforcement for RCC work including straightening cuting bending placing in position and binding complete upto plinth level thermo-Mechanically Treated bars grade Fe 500D or more | 2,156.4 | kg | 103.9 | ₹2,24,049.96 |
| 10 | Centering shuttering including struttings, propping etc.and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and
cantilevers with wooden plank | 1 | sqm | 496.1 | ₹496.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73479.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DNIT.pdf
Tender Documents • 4.09 MB
BOQ49.xls
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].