| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 LAccepted-Finance | ₹1.3 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹1.6 L+₹25,352.20 (19.2%)Rejected-Finance | ₹1.6 L+₹25,352.20 (19.2%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹1.6 L+₹30,602.08 (23.2%)Rejected-Finance NOT AVAILABLE | ₹1.6 L+₹30,602.08 (23.2%) | L-3 | Rejected-Finance Lowest-3 |
| Sl No | Description | Qty | Unit | Lekh Ram L2 | KIRAN L1 | RAMESH KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiselling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying, jointing, testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming & watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 132.3 | Cum | 650 ₹85,995 | 601 ₹79,512.3 Lowest | 680 ₹89,964 |
| 2.00 | Cutting of GI pipe of various dia, confirming to IS 1239-1990 (Part-II) one layer at various point with generator welding at site of work according to relevant BIS standards/approved specifications including carriage of material complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 3,124.09 | Cm | 4.7 ₹14,683.22 | 3.25 ₹10,153.29 Lowest | 4.9 ₹15,308.04 |
| 3.00 | Welding of GI pipe of various dia, confirming to IS 1239-1990 (Part-II) with Diesel Generator welding set at site of work according to site requirement in minimum three layer to make the joint leak proof according to relevant BIS standards/approved specifications including carriage of material and Die penetration test complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 9,372.27 | Cm | 6.03 ₹56,514.79 | 4.5 ₹42,175.22 Lowest | 6.1 ₹57,170.85 |
Tender Value
₹1.5 L
EMD Value
₹3,100
Closing Date
6 May 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_135149_1
EE-JSD-BGI/2026- 2274-2324 dt. 25/04/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
₹3,100
18 Jul 2026
28 Apr 2026
6 May 2026
28 Apr 2026
6 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiselling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying, jointing, testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming & watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 132.3 | Cum | - | - |
| 2 | Cutting of GI pipe of various dia, confirming to IS 1239-1990 (Part-II) one layer at various point with generator welding at site of work according to relevant BIS standards/approved specifications including carriage of material complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 3,124.09 | Cm | - | - |
| 3 | Welding of GI pipe of various dia, confirming to IS 1239-1990 (Part-II) with Diesel Generator welding set at site of work according to site requirement in minimum three layer to make the joint leak proof according to relevant BIS standards/approved specifications including carriage of material and Die penetration test complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 9,372.27 | Cm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
FORM6_7.pdf
Tender Documents • 0.45 MB
TC.pdf
Tender Documents • 0.15 MB
BOQ_200126.xls
BOQ • 2.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .