Executive Engineer IFCD Ganderbal
Irrigation and FC DIvision Ganderbal
Upgradation/ Modernization of existing Canals of Ganderbal Constituency.
2026_IFC_326965_1
eNIT NO 27 OF 2026-27
Open Tender
Civil Works
Percentage
180 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer IFCD Ganderbal
₹2.9 L
3 Oct 2026
3 Oct 2026
19 Oct 2026
3 Oct 2026
17 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 1,058 | Cum | 187.3 | ₹1,98,163.4 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All Kinds of Soil :- | 98.71 | Cum | 592.9 | ₹58,525.16 |
| 3 | Providing and Laying of stone soling hand packed in horizontal on level including cost of stones. | 139.54 | Cum | 937.9 | ₹1,30,874.57 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 164.17 | Cum | 5,202.9 | ₹8,54,160.09 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 2,199.59 | sqm | 286.35 | ₹6,29,852.6 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 45.74 | cum | 5,733.6 | ₹2,62,254.86 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 949.69 | Cum | 6,591.25 | ₹62,59,644.21 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 22.27 | cum | 7,104.35 | ₹1,58,213.87 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,303.34 | Kg | 123.2 | ₹1,60,571.49 |
| 10 | 12mm Cement plaster of mix:
1 : 4 ( 1 cement : 4 fine sand) | 1,819.12 | Sqm | 283.8 | ₹5,16,266.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.07 MB
BOQ_1105946.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .