Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.V(1) dtd.11-01-2023 of Athavanad GP | |
| 2 | L2₹6.0 L+₹938.39 (0.16%)Rejected-Finance KARIPPOL PO MALAPPURAM PIN 676552 | MALAPPURAM | MALAPPURAM | KERALA | 676552 | L2 | Rejected-Finance Higher rate and hence not admitted |
Tender Value
₹5.5 L
EMD Value
₹13,661
Closing Date
30 Dec 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Abdul Khaliq C.M
Office of the Assistant Engineer LID EW Section
Annual plan 22-23 AGP-18/22-23-PROTECTION TO AYYAPPANOV CHAAMATHI THODE-General Civil Work-WARD 13
2022_LSGD_542396_2
AE/ATVD/LSGD/ET/06/22-23
Open Tender
Civil Works - Others
Item Rate
270 days
Athavanad GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,205
Yes
₹13,661
Yes
17 Apr 2023
23 Dec 2022
3 Jan 2023
23 Dec 2022
30 Dec 2022
23 Dec 2022
Amount
thode protection
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
foot path slab
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
ABDUL RAZACK.T.K
Bidder Name
ABDUL RAZACK.T.K
saithalikutty
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_791366.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .