Loading…
Loading…
Tender Value
₹5.4 L
EMD Value
₹13,600
Closing Date
3 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
the Executive EngineerPMU,KSD
Office of the Executive Engineer, Project Management Unit, Vydhyuthi Bhavanam, Vidhyanagar, Kasaragod 671123
CONSTRUCTION OF HT LINE USING ABC AND TRANSFORMER INSTALLATION AT SHAMA QUATERS UNDER ELECTRICAL SECTION,CHERKALA
2026_KSEB_851566_2
06/26-27/EE/PMU/KSD dt 16-05-2026
Open Tender
Electrical Works
90 days
CHERKALA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,298
₹13,600
15 Jun 2026
15 Jun 2026
6 Jul 2026
17 Jun 2026
3 Jul 2026
19 Jun 2026
17 Jun 2026 - 3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 6 | E | 164.67 | ₹988.02 |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. | 6 | No | 2,266.55 | ₹13,599.3 |
| 3 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. | 6 | No | 1,737.55 | ₹10,425.3 |
| 4 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. | 25 | No | 1,086.23 | ₹27,155.75 |
| 5 | Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite. | 25 | No | 868.77 | ₹21,719.25 |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 11 | Trip | 3,142.26 | ₹34,564.86 |
| 7 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 11 | No | 1,373.73 | ₹15,111.03 |
| 8 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 23 | No | 868.77 | ₹19,981.71 |
| 9 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. | 1 | No | 3,056.91 | ₹3,056.91 |
| 10 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 13 | No | 762.14 | ₹9,907.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1446424.xls
BOQ • 0.29 MB
TenderDocument.pdf
Tender Documents • 0.62 MB
NIT.pdf
Other Document • 0.81 MB
BIDDERDEAILS.pdf
Other Document • 0.55 MB
Download all tender documents and submit your bid