Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3 L
Closing Date
20 Apr 2026, 6:00 pmClosed
The Executive Engineer
M&R work of Distributory Canal Lakhtar Distry (LD-2), Lakhtar Sub Distry (LSD-2) and its Minor canals of Limbdi Branch Canal
291513
56 of 2025-26
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Executive Engineer SBC Dn No.4/1 Limbdi
₹3 L
30 Mar 2026
30 Mar 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed work.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A)Percentage Rate Tender (Up to INR 50 Cr.)
Name of Work: - M&R work of Distributory Canal Lakhtar Distry (LD-2), Lakhtar Sub
Distry (LSD-2) and it’s Minor canals of Limbdi Branch Canal. .
Description of Item Quantity Unit Amount in Rs.
Dismantling the existing c.c. lining
including shoring out the dismantled
stuff and stacking the useful material
1 and removing the debris and making 31707.00 Sqmt 83.70
good the damage etc. comp as and
For 7.5 cm Thick Lining
Providing and fixing HDPE film
2 micron thick Geo membrane below 31707.00 Sqmt 49.70
concrete lining
Providing and fixing welded wiremesh
1.8 mm x 65mm x 65 mm with 30 gsm
galvanized coating confirming to IS
280 -2006 as per specification.
Providing and Laying in position
Nominal Mix Plain/Reinforced Cement
Concrete Lining of 1:2:4 using cement,
sand and crushed aggregate in Bed,
Side Slopes and Curvature including
batching, mixing, transporting, placing,
vibrating, smooth finishing, membrane
curing (By Curing Compound Only) as
directed with all lead & lift etc.
complete including dressing the bed
and trimming the canal section and
minor filling with murrum / earth as per
site condition to correct profile incl.
providing bitumen joints at specified
interval. (Without Using Paver
Machineries& without sleepers)
For 7.50 cm thick canal lining in Bed /
Providing and Laying in position
Nominal Mix Plain/Reinforced Cement
Concrete Lining of 1:2:4 using cement,
sand and crushed aggregate in Bed,
Side Slopes and curvature including
batching, mixing, transporting, placing,
5 vibrating, smooth finishing, membrane 32719.00 Sqmt 340.51
curing (by curing compound only) &
providing bitumen joints at specified
(Without Using Paver Machinaries &
without sleepers) For 7.50 cm thick
canal lining in Bed / Slope
Earthwork / Back filling with selected
earth brought from out side borrow area
or from excavated useful material
including watering ramming,
Compaction with pneumatic temping
and all lead and lift etc complete.
I/We am/are willing to carry out the work at… ....................... %above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (ForaboveINR50Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………
(C) NetTenderedAmount(A-B) (infigure) …………………………
1 The Contractor shall exhibit aboard with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.5 Rs / MT for OPC) mentioned in
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD LD 2 LSD2 DTP.pdf
BOQ.pdf
Tender Notice M and R LD 2 LSD 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .