Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance 12 BATAPORA SRINAGAR NEAR GOUSIA CEMENT TILES BATAPORA SRINAGAR JAMMU KASHMIR 190006 UDYAM JK 21 0019369 | SRINAGAR | JAMMU AND KASHMIR | 190006 | -33.11% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹28.1 L (9.63%)Admitted-Finance R O CHECKPORA CHADOORA BUDGAM | BUDGAM | JAMMU AND KASHMIR | 190007 | -26.67% | ₹3.2 Cr+₹28.1 L (9.63%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹42.1 L (14.4%)Admitted-Finance | -23.45% | ₹3.3 Cr+₹42.1 L (14.4%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 Cr+₹44.3 L (15.2%)Admitted-Finance | -22.96% | ₹3.4 Cr+₹44.3 L (15.2%) | L4 | Admitted-Finance |
| 5 | L5₹3.7 Cr+₹74.2 L (25.4%)Admitted-Finance | -16.11% | ₹3.7 Cr+₹74.2 L (25.4%) | L5 | Admitted-Finance |
Tender Value
₹4.4 Cr
EMD Value
₹8.7 L
Closing Date
2 Apr 2026, 4:00 pmClosed
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Patt
Upgradation of Link Roads at Palhallan Pattan Under NABARAD-XXXI .
2026_PWDJK_304592_1
NIT 82 of RnB Pattan 2025-26
Open Tender
Civil Works
Percentage
550 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,500
Office of The Executive Engineer RnB Division Patt
₹8.7 L
Superintending Engineer RnB Circle Baramulla
15 Apr 2026
26 Feb 2026
3 Apr 2026
4 Mar 2026
2 Apr 2026
4 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil, incld. cutting of trees,removal of tree stumps and vegetation from the site | 1,761.74 | Cum | 187.3 | ₹3,29,973.9 |
| 2 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 1,057.04 | Cum | 467.3 | ₹4,93,954.79 |
| 3 | Cross drainage Works:-Providing and laying of reinforced cement concrete pipe NP3 in proper positions and slope on first class bedding of granular material in single row ,incld excavation,back filling and cushioning over pipes to the required gradient and camber ,fixing collar with cement mortor 1:2 mix concrete incld cost of pipes and carriage by mechanical transport from source to site loading,unloading complete Job 300 mm dia. | 73.2 | Rm | 2,500 | ₹1,83,000 |
| 4 | Providing and laying of reinforced cement concrete pipe NP3 in proper positions and slope on first class bedding of granular material in single row ,incld excavation,back filling and cushioning over pipes to the required gradient and camber ,fixing collar with cement mortor 1:2 mix concrete incld cost of pipes and carriage by mechanical transport from source to site loading,unloading complete Job 450 mm dia. | 29.28 | Rm | 4,500 | ₹1,31,760 |
| 5 | Providing and laying of reinforced cement concrete pipe NP3 in proper positions and slope on first class bedding of granular material in single row ,incld excavation,back filling and cushioning over pipes to the required gradient and camber ,fixing collar with cement mortor 1:2 mix concrete incld cost of pipes and carriage by mechanical transport from source to site loading,unloading complete Job 900 mm dia. | 14.64 | Rm | 7,000 | ₹1,02,480 |
| 6 | Protection Works(R-Wall :-Earth work in excavation in all kinds of soil by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer | 207.9 | Cum | 256.85 | ₹53,399.12 |
| 7 | Supply and filling of dry stone soling in foundation trenches/ under floors tightly hand packed with hand ramming, dressing , watering incld. carriage of material from source to site of work complete | 22.28 | Cum | 1,000 | ₹22,280 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) including all carriages. | 14.85 | Cum | 5,753.75 | ₹85,443.19 |
| 9 | Random Rubble masonry with hard stone in foundation and plinth using Quarry Stone including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages. | 53.8 | Cum | 8,305.6 | ₹4,46,841.28 |
| 10 | Dry random rubble masonry with hard stone in foundation and plinth using quarry stone with bond stone including all carriages. | 125.45 | Cum | 5,988.05 | ₹7,51,200.87 |
stage.html
html • 0.03 MB
techsummary_989430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_989430.xls
BOQ • 0.32 MB
Extension.pdf
PDF • 5.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .