Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical JATUDIH MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | Accepted-Technical Technically Evaluated |
| 2 | Accepted-Technical MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | Accepted-Technical Technically Evaluated |
| 3 | Accepted-Technical MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | Accepted-Technical Technically Evaluated |
Tender Value
₹14.3 L
EMD Value
₹17,855
Closing Date
31 Jul 2026, 5:00 pmClosed
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Lifting (by chain pulling ) from 8 dip, transport and lowering LHD 4 (by chain pulling ) pumping station XVI seam, at Moonidih Colliery W.J Area
2026_BCCL_362317_1
BCCL/WJA/MND/SUR/2026-27/16
Open Tender
Miscellaneous Works
Percentage
50 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹17,855
11 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Lifting(by chain pulling ) from 8 dip, transport and lowering LHD 4 (by chain pulling ) pumping station XVI seam, at Moonidih Colliery W.J Area | |||||
| 1.01 | Lifting of 02 pumps, 02motors, 02 baseframes from 8 dip ( lefting 130m) and lowering to LHD4 (lowering 130m) (by chain pulling) (i) Analysis For every 12 mt lifting or lowering of pumps, motors, baseframes etc analysis 6 unskilled manshift is required for 12m. manshift is required (130 + 130)/12 x 6 manshift X 6 item = 780 manshift. | 780 | Unskilled manpower | 1,437.6 | ₹11,21,328 |
| 1.02 | loading into arm trolly , transport through haulage and unloading the pumps-set in haulage dip
Manshift Required = 8 manpower/shift
Shifts required = 6 Manpower required = 8x6 =48 | 48 | Unskilled manpower | 1,437.6 | ₹69,004.8 |
| 1.03 | Installing of the Pump-set and cable layout
Manshift Required = 6 manpower/shift
shifts required = 4
Manpower required = 24 | 24 | Unskilled manpower | 1,437.6 | ₹34,502.4 |
| 1.04 | 15 pipes of 6" laying and fitting Analysis 4 unskilled manshift is required for 5 pipe. Manshift required (15/5)x 4=12 manshift | 12 | Unskilled manpower | 1,437.6 | ₹17,251.2 |
| 1.05 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 1,86,312.96 | ₹1,86,312.96 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled surface | 864 | hd | 275.26 | ₹2,37,824.64 |
| 3Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.59 MB
BOQ_375214.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .