| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.8 LAccepted-AOC | ₹10.8 L | 1 | Accepted-AOC AOC |
| 2 | 2₹11.6 L+₹79,825.40 (7.42%)Rejected-AOC | ₹11.6 L+₹79,825.40 (7.42%) | 2 | Rejected-AOC L2 |
| 3 | 3₹11.7 L+₹94,256.38 (8.76%)Rejected-Finance GRAM PATHARIYA PANCHAYAT SUGAPAHADI 2 POST MADHUPUR POLICE STATION BUDHEI BLOCK SUB DIVISION MADHUPUR DISTRICT DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹11.7 L+₹94,256.38 (8.76%) | 3 | Rejected-Finance L3 |
| 4 | 4₹12.2 L+₹1.4 L (13.0%)Rejected-Finance HN 03 SAVITRI BHAWAN KAPASARA EHARKUNR DIST DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | ₹12.2 L+₹1.4 L (13.0%) | 4 | Rejected-Finance L4 |
| 5 | 5₹12.4 L+₹1.7 L (15.6%)Rejected-Finance DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | KHUNTI | JHARKHAND | 835209 | ₹12.4 L+₹1.7 L (15.6%) | 5 | Rejected-Finance L5 |
Tender Value
₹13.0 L
EMD Value
₹26,100
Closing Date
16 May 2026, 5:00 pmClosed
District Engineer, Zila Parishad, Dhanbad
District Engineer, Zila Parishad, Dhanbad
Construction of a Drain from Rajesh Yadav house to Bhola Ram house at Bihar Fire Bricks. (2) Construction of a Drain from Angad Mishra house, passing through Pintu Singh house up to Gunjan Sinha house in Rajendra Bihar Colony under Vrindavanpur
2026_ZPDH_113690_20
5/2026-27/DE/ZPDH/DHANBAD
Open Tender
Civil Works
Percentage
120 days
Egarkund
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
₹26,100
31 Aug 2026
8 May 2026
18 May 2026
8 May 2026
16 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drain 1. Dismantling pucea brick or lime work including stacking serviceable materials in countable stacks within 1SM. Lead and disposal of unserviceable materials with all leads all complete as per direction (5.10.1) | 43.32 | cum | 541.67 | ₹23,465.14 |
| 2 | Excavation for structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (3.13(i),A) | 45.49 | cum | 316.2 | ₹14,383.94 |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (5.1.10) | 21.66 | cum | 589.51 | ₹12,768.79 |
| 4 | Providing designation 75 B one brick flat soling in foundation and plinth do-do-E/I (5.6.3) | 86.64 | m2 | 330.34 | ₹28,620.66 |
| 5 | PCC1:3:6 in Foundation
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (12.04) | 6.5 | cum | 3,376.1 | ₹21,944.65 |
| 6 | PCC/RCC in Substructure
Plain/reinforced cement concrete in Substructure complete as per drawing and technical
specifications RCC Grade M20 Height upto 5m (12.08C case ii) | 25.81 | cum | 4,499.7 | ₹1,16,137.26 |
| 7 | Centering and shuttering including strutting,propping etc and removal of form work for mass concrete do-do-E/I (5.3.17.1) | 317.47 | cum | 194.5 | ₹61,747.92 |
| 8 | Providing tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved deign and drawing as per building specification and direction of E/I (a) 10mm (TMT coil Fe 500) (only valid for TATA(Tucson), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (b) 12mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (c) 16mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (5.5.1(II)+ 5.5.5(abc)) | 2.57 | MT | 82,096.54 | ₹2,11,152.3 |
| 9 | Add Carriage of Material
Sand | 38.52 | m3 | 338.2 | ₹13,027.46 |
| 10 | Stone Chips | 31.12 | m3 | 338.2 | ₹10,524.78 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Tendernotice_2.pdf
PDF • 0.39 MB
BOQ_153689.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .