Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Fee/PreQual/Technical/Finance | -17.00% | ₹8.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹10.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹10,032
Closing Date
6 Aug 2026, 5:00 pmClosed
Block Develoment Officer Attabira
Attabira
Construction of CC Road from Dharanitikra to RD Road, Manapada GP of Attabira Block for the year 2025-26.
2026_PRBA_136711_1
01/2026-27
Open Tender
Civil Works - Roads
Percentage
3 days
Attabira Block
road
3 documents required · 3 mandatory
₹6,000
Yes
₹10,032
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Fine dressing of Earthwork in ordinary soil or hard soil in road formation according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. | 605.9 | Sqm | 5.37 | ₹3,253.68 |
| 2 | E/W in hard soil with initial lead & lift including rough dressing & levelling as per direction of engineer-in-charge. | 7.47 | Cum | 276.89 | ₹2,068.37 |
| 3 | Filling sand in cut-off wall & Road surface area with well watered & ramming etc. | 58.1 | Cum | 786.36 | ₹45,687.52 |
| 4 | Cement concrete (1:3:6) using 4cm size hard crusher granite metal including all cost etc. | 70.55 | Cum | 6,089.48 | ₹4,29,612.81 |
| 5 | Cement concrete (1:2:4) using 12mm size hard crusher granite chips including all cost etc. | 60.59 | Cum | 7,409.23 | ₹4,48,925.25 |
| 6 | Rigid and Smooth Centring and Shutter & dismantling the same after casting including cost of material etc. complete. | 182.6 | Sqm | 248.67 | ₹45,407.14 |
| 7 | Hire charges of vibrator(2.5Cum/Hour) | 52.45 | Hour | 153.23 | ₹8,036.91 |
| 8 | Conveying from stacks & spreading Moorum to road surface with Moorum to proper compaction | 29.88 | Cum | 674.21 | ₹20,145.39 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_602777.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].