Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹4.1 Cr+₹47.1 L (13.1%)Rejected-Finance | ₹4.1 Cr+₹47.1 L (13.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.2 Cr+₹64.2 L (17.8%)Rejected-Finance | ₹4.2 Cr+₹64.2 L (17.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.8 Cr+₹1.2 Cr (32.8%)Rejected-Finance M M ALI ROAD KOZHIKODE | KOZHIKODE | KERALA | 612906 | ₹4.8 Cr+₹1.2 Cr (32.8%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | HASCON CONSTRUCTIONS AND INTERIORS L4 | NISHADALI V.M. L3 | JOSEMON MATHEW L1 | KATTAT BUILDERS AND DEVELOPERS LLP L2 |
|---|---|---|---|---|---|---|---|
| 1.00Administration and Vocational Training Block | |||||||
| 1.10 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,638 | m2 | 16.5 ₹27,027 | 16.7 ₹27,354.6 | 14 ₹22,932 | 12 ₹19,656 Lowest |
| 1.10 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 318.25 | m3 | 340 ₹1,08,203.3 | 400 ₹1,27,298 | 290 ₹92,291.05 Lowest | 340 ₹1,08,203.3 |
| 1.10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.11 | m3 | 8,850 ₹71,791.2 | 7,683.01 ₹62,324.58 | 6,761 ₹54,845.23 Lowest | 8,000 ₹64,896 |
| 1.10 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 203 | m2 | 420 ₹85,260 | 354.69 ₹72,002.07 | 312 ₹63,336 Lowest | 360 ₹73,080 |
| 1.10 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 247 | m2 | 925 ₹2,28,475 | 926.37 ₹2,28,813.39 | 815 ₹2,01,305 Lowest | 950 ₹2,34,650 |
| 1.11 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 53.33 | m3 | 10,250 ₹5,46,601.75 | 9,634.13 ₹5,13,759.25 | 8,478 ₹4,52,106.31 Lowest | 10,500 ₹5,59,933.5 |
| 1.11 | Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 441.95 | m2 | 745 ₹3,29,252.01 | 700.72 ₹3,09,682.5 | 616 ₹2,72,240.58 Lowest | 700 ₹3,09,364.3 |
| 1.11 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,132.17 | Kg | 95 ₹6,77,556.15 | 95 ₹6,77,556.15 | 90 ₹6,41,895.3 Lowest | 95 ₹6,77,556.15 |
| 1.11 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 21 | m3 | 11,250 ₹2,36,250 | 11,731.49 ₹2,46,361.29 | 1,032 ₹21,672 Lowest | 10,800 ₹2,26,800 |
Tender Value
₹4.1 Cr
EMD Value
₹1 L
Closing Date
13 Jul 2026, 11:00 amClosed
Project Director
COSTFORD, Head Office, Ayyanthole, Thrissur
This estimate mainly includes the construction of Administrative and Vocational Training block, Day-care, Horticulture area, Road and Drainage line and Manhole for creating integrated rehabilitation village for persons with disabilities.
2026_CFD_857369_1
CFD/AYL -2026 /1-1
Open Tender
Civil Works - Buildings
Item Rate
Kurumbathoor Village
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
COSTFORD , Head office Ayyanthol , Thrissur
16 Sept 2026
24 Jun 2026
14 Jul 2026
24 Jun 2026
13 Jul 2026
6 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Administration and Vocational Training Block | |||||
| 0.999 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | m2 | 100 | - |
| 0.000 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | m3 | 100 | - |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | m3 | 100 | - |
| 0.000 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | m2 | 100 | - |
| 0.999 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | m2 | 10 | - |
| 0.000 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | m3 | 10 | ₹9.99 |
| 0.999 | Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | m2 | 10 | ₹6 |
| 0.000 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | Kg | 10 | - |
| 0.999 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | m3 | 10 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449307.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 1.15 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Drawing1.pdf
Other Document • 0.31 MB
NIT.pdf
Tender Documents • 0.22 MB
Drawing2.pdf
Other Document • 0.19 MB
SBD.pdf
Tender Documents • 1.13 MB
Agreement.pdf
Other Document • 0.14 MB
BOQ_1449307.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .