Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.7 L+₹1,482.16 (0.12%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | G K Guna Bhala Sekar L1 | Rajakrishnan L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work: Providing Drainage at Anbu Nagar 2nd Street to Pasupathipalayam Pirivu H/O Kathaparai | |||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 179.28 | M3 | 263.38 ₹47,218.77 Lowest | 264.68 ₹47,451.83 |
| 3.00 | Cement concrete 1:4:8 mix (one cement four sand and eight 2 aggregate) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found necessary and laid in layers etc., | 19.92 | M3 | 5,400.04 ₹1,07,568.8 Lowest | 5,401.34 ₹1,07,594.69 |
| 4.00 | Supplying and erecting centering shuttering including necessary 3 supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof
etc., | 601.66 | M2 | 547.1 ₹3,29,168.19 Lowest | 548.4 ₹3,29,950.34 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.12 | M2 | 91,865.46 ₹11,023.86 Lowest | 91,866.76 ₹11,024.01 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M Sand and Three hard broken stone jelly) using 20 mm gauge hand broken granite tone jelly for foundation including dewatering if found necessary and laid in layers etc., | 0.97 | M3 | 9,123.72 ₹8,850.01 Lowest | 9,125.02 ₹8,851.27 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two. M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 89.64 | M3 | 6,151.49 ₹5,51,419.56 Lowest | 6,152.79 ₹5,51,536.1 |
| 8.00 | Plastering walls with CM 1:5 12mm thick etc., complete | 74.7 | M3 | 282.62 ₹21,111.71 Lowest | 283.92 ₹21,208.82 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,93,745 ₹1,93,745 Lowest | 1,93,971 ₹1,93,971 |
Tender Value
Refer Docs
EMD Value
₹12,830
Closing Date
17 Dec 2025, 3:00 pmClosed
BDO(B.Pt), Karur
BDO(B.Pt), Karur
Providing Drainage at Anbu Nagar 2nd Street to Pasupathipalayam Pirivu at Kathaparai
2025_RDTN_631067_1
Providing Drainage at Anbu Nagar 2nd Street to Pasupathipalayam Pirivu at Kathaparai
Open Tender
Civil Works - Others
Item Wise
90 days
Karur Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,830
Yes
18 Dec 2025
11 Dec 2025
17 Dec 2025
11 Dec 2025
17 Dec 2025
11 Dec 2025
Amount
Name of the Work: Providing Drainage at Anbu Nagar 2nd Street to Pasupathipalayam Pirivu H/O Kathaparai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight 2 aggregate) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found necessary and laid in layers etc.,
Supplying and erecting centering shuttering including necessary 3 supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof etc.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M Sand and Three hard broken stone jelly) using 20 mm gauge hand broken granite tone jelly for foundation including dewatering if found necessary and laid in layers etc.,
Plain Cement Concrete 1:3:6 (one cement, two. M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering walls with CM 1:5 12mm thick etc., complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Rajakrishnan (BID ID -1536222)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
BOQ_754708.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .