Tender Value
₹3.7 L
EMD Value
₹7,480
Closing Date
17 Sept 2026, 4:00 pm2d left
Executive Engineer Hydraulic Division Uri
Hydraulic Division Uri
Construction of R/wall and cement concrete channel on Dawaran Khul and bed treatment for Gingle A Khul at spots.
2026_IFC_324051_1
eNIT No 12/Hyd/Uri of 2026-27
Open Tender
Civil Works
Percentage
25 days
Uri
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer Hydraulic Division Uri
₹7,480
Yes
9 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 4.86 | Cum | 479.3 | ₹2,329.4 |
| 2 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) (50% of Total Stone Masonary Work (Stones avalaible | 11.99 | Cum | 5,277.35 | ₹63,275.43 |
| 3 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) (Stones Avalaible) | 10.66 | Cum | 6,731.9 | ₹71,762.05 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. (30% of total dry masonary work) Stones available at site) | 6.35 | Cum | 3,136.55 | ₹19,917.09 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. (70% of total dry masonary work) Stones to be supplied) | 14.82 | Cum | 5,536.35 | ₹82,048.71 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 10.05 | Cum | 5,733.6 | ₹57,622.68 |
| 7Centering and shuttering including strutting, propping etc and removal of form work for: | |||||
| 7.1 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string course fillets, kerbs andsteps etc | 24 | Sqm | 628.95 | ₹15,094.8 |
| 8 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled Pointing | 72 | Sqm | 297 | ₹21,384 |
| 9Carriage of Material from source upto road/dumping site of work by Mechanical Transport including loading unloading and stacking etc complete | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1092396.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .