Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 LAccepted-Finance | ₹7.5 L | 1 | Accepted-Finance L-1 bidder |
| 2 | 2₹7.6 L+₹14,316 (1.91%)Rejected-Finance | ₹7.6 L+₹14,316 (1.91%) | 2 | Rejected-Finance Not L-1 bidder |
| 3 | 3₹7.9 L+₹37,860 (5.06%)Rejected-Finance RAJKOT GUJARAT | AHMADABAD | GUJARAT | 363423 | ₹7.9 L+₹37,860 (5.06%) | 3 | Rejected-Finance Not L-1 bidder |
| 4 | 4₹8.6 L+₹1.1 L (14.4%)Rejected-Finance | ₹8.6 L+₹1.1 L (14.4%) | 4 | Rejected-Finance Not L-1 bidder |
| 5 | 5₹8.6 L+₹1.1 L (14.9%)Rejected-Finance | ₹8.6 L+₹1.1 L (14.9%) | 5 | Rejected-Finance Not L-1 bidder |
Tender Value
Refer Docs
EMD Value
₹12,100
Closing Date
3 Sept 2020, 4:00 pmClosed
GENERAL MANAGER (MATERIALS AND CONTRACTS)
Indian Oil Corporation Limited, Western Region Pipelines, P.O. Bedipara, Morbi Road, Gauridad, Distt. Rajkot-360 003 (Gujarat)
Washout repair at Ch. 178.9 Km under WRPL Surendranagar Jurisdiction
2020_WRRAJ_122140_1
PWRJT20027
Open Tender
Civil Works
Works
28 days
WRPL SURENDRANAGAR
Please refer Tender documents.
15 documents required · 15 mandatory
₹12,100
Yes
5 Mar 2021
21 Aug 2020
4 Sept 2020
21 Aug 2020
3 Sept 2020
28 Aug 2020
CIVIL WORKS
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by the Engineer-in-Charge.
a) All kinds of soil
Earth work in excavation by mechanical means (Hydraulic Excavator)/ Manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by the Engineer-in-Charge : Ordinary rock
Earth work in excavation by mechanical means (Hydraulic Excavator)/ Manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by the Engineer-in-Charge : Hard rock (blasting prohibited)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
PLAIN CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(1:3:6 (1 cement : 3 coarse sand (Zone-III) : 6 graded stone aggregate 20 mm nominal size))
Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 10 mm down size) mixed with approved brand of water proofing compound @ 1Kg/50 Kg bag of cement, in roof grading, coping, in bed concrete etc. at all heights & depths, including providing centering and shuttering, scaffolding, watering, curing, vibrating, etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Site Engineer.
MASONARY WORK
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : (Cement mortar 1:6 (1 cement : 6 coarse sand))
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.(Cement mortar 1:6 (1 cement : 6 coarse sand))
REINFORCED CEMENT CONCRETE
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III): 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Thermo-Mechanically Treated bars of grade Fe-500D or more)
Other Works
Supplying, providing and filling fine sand in trenches in stretches other than normal soil and hard rock (including additional 150mm deep trenching) around mainline pipe for providing a minimum padding thickness of 150mm on top as well as at bottom of the mainline pipe.(28" pipe)
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. :450 mm dia RCC pipes
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. :450 mm dia RCC pipes
Providing and laying non-pressure NP-2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :450 mm dia. R.C.C. pipe
REAL ASSOCIATES
sagathia govindbhai k
M/s Shri Valjibhai R Vaghela
DSP ENTERPRISES
aaminaconstruction
AARVI CONSTRUCTION
Shivam Construction
AMAAR SALES
K K PARMAR
M/s Shakti Engineers
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .