Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.3 LAccepted-AOC BAGESHWAR UTTARAKHAND UT | ₹90.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹90.6 LRejected-AOC GRAM MANELA PO GHAGHAS DWARAHAT | ALMORA | UTTARAKHAND | 263601 | ₹90.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹92.0 LRejected-AOC | ₹92.0 L | L3 | Rejected-AOC L3 |
| 4 | L4₹92.9 LRejected-AOC | ₹92.9 L | L4 | Rejected-AOC L4 |
| 5 | L5₹99.6 LRejected-AOC BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹99.6 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Mahesh Chandra Sanwal L5 | Jeevan Singh Mehra L2 | M/S HARISH CHANDRA DEVRARI L1 | PRIYANKA CONSTRUCTION L3 | Ganesh Mehta L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),i/ldressing of sides and ramming of bot toms, lift upto 1.5 m, i/l getting out the excavated soil and disposal of surplus exc avated soil as directed, within a lead of 50 m.All kinds of soil. | 132.01 | cum | 206.12 ₹27,209.90 | 187.52 ₹24,754.52 | 186.86 ₹24,667.39 | 190 ₹25,081.90 | 190 ₹25,081.90 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 | 32.68 | cum | 5,394.18 ₹1.8 L | 4,907.53 ₹1.6 L | 4,890.21 ₹1.6 L | 5,050 ₹1.7 L | 5,400 ₹1.8 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 | 1.08 | cum | 6,238.7 ₹6,737.80 | 5,675.85 ₹6,129.92 | 5,655.82 ₹6,108.29 | 6,400 ₹6,912 | 5,400 ₹5,832 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 | 44.15 | cum | 7,163.01 ₹3.2 L | 6,516.77 ₹2.9 L | 6,493.78 ₹2.9 L | 6,750 ₹3.0 L | 6,600 ₹2.9 L |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 | 13.01 | cum | 8,594.07 ₹1.1 L | 7,818.73 ₹1.0 L | 7,791.13 ₹1.0 L | 8,500 ₹1.1 L | 8,100 ₹1.1 L |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 | 136.42 | cum | 9,110.79 ₹12.4 L | 8,288.83 ₹11.3 L | 8,259.58 ₹11.3 L | 8,400 ₹11.5 L | 8,500 ₹11.6 L |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete | 62.92 | sqm | 310.53 ₹19,538.55 | 282.51 ₹17,775.53 | 281.52 ₹17,713.24 | 285 ₹17,932.20 | 50 ₹3,146 |
| 8.00 | Suspended floors, roofs, landings, balconies and access platform | 648.11 | sqm | 734.26 ₹4.8 L | 668.02 ₹4.3 L | 665.66 ₹4.3 L | 670 ₹4.3 L | 550 ₹3.6 L |
| 9.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 198.62 | sqm | 583.13 ₹1.2 L | 530.52 ₹1.1 L | 528.65 ₹1.1 L | 545 ₹1.1 L | 500 ₹99,310 |
| 10.00 | Columns, Pillars, Piers, Abutments, Posts and Struts | 194.76 | sqm | 761.22 ₹1.5 L | 692.54 ₹1.3 L | 690.1 ₹1.3 L | 700 ₹1.4 L | 650 ₹1.3 L |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
26 Jun 2024, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
The work of developing the required basic facilities in GGIC Sarkot, selected as a cluster school
2024_RES_72475_1
313 Dated 11-06-2024
Open Tender
Civil Works - Buildings
360 days
Sarkot
The work of developing the required basic facilities in GGIC Sarkot, selected as a cluster school
2 documents required · 2 mandatory
₹4,720
4000 D.H. and Rs. 720 GST No.
₹2.1 L
3 Feb 2026
19 Jun 2024
27 Jun 2024
19 Jun 2024
26 Jun 2024
19 Jun 2024
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid