| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC M/s Harsh Engineering Components Co. has been identified as the L-1 bidder, having submitted the lowest bid among all TACA bidders. |
| 2 | 2₹1.2 Cr+₹15.1 L (15.0%)Rejected-Finance 401 404 HILTON CENTER SECTOR 11 CBD BELAPUR NAVI MUMBAI THANE MAHARASHTRA 400614 | THANE | MAHARASHTRA | 400614 | ₹1.2 Cr+₹15.1 L (15.0%) | 2 | Rejected-Finance Higher price bid |
| Sl No | Description | Qty | Unit | Damodhartech international Pvt Ltd L2 | HARSH ENGINEERING COMPONENTS CO L1 |
|---|---|---|---|---|---|
| 1.00Effecting Pipeline Upgradation | |||||
| 1.01 | Supply of material for " Effecting Pipeline upgradations to divert gas from Seal Oil traps of Lean gas compressors (K103 A/B) and Propane Compressor (K-105) from existing flare header to fuel gas KOD/LP gas header and 1st stage suction respectively in LPG plant as per SOW A3". | 1 | Nos | 60,67,691.5 ₹71,59,875.97 | 25,00,000 ₹29,50,000 Lowest |
| 1.02 | Servicing cost for "Pipeline upgradations to divert gas from Seal Oil traps of Lean gas compressors (K103 A/B) and Propane Compressor (K-105) from existing flare header to fuel gas KOD/LP gas header and 1st stage suction respectively in LPG plant". | 1 | Nos | 2,47,532.63 ₹2,92,088.5 Lowest | 12,00,000 ₹14,16,000 |
| 1.03 | Supply of material for "Effecting Pipeline upgradations for laying of fire water line for running IA/IG compressors for cooling purpose in case of black out situations as per SOW A9". | 1 | Nos | 13,81,456.7 ₹16,30,118.91 | 10,00,000 ₹11,80,000 Lowest |
| 1.04 | Servicing cost for "Effecting Pipeline upgradations for laying of fire water line for running IA/IG compressors for cooling purpose in case of black out situations ." | 1 | Nos | 4,24,278 ₹5,00,648.04 Lowest | 5,00,000 ₹5,90,000 |
| 1.05 | Supply of material for "Effecting Pipeline upgradations to mitigate the bottlenecking of higher MP flash gas pressure in GSU trains by resizing/rerouting flash gas header and fuel gas disposal header to maintain about 5.5 kg/cm2g against current pressure of 7.5-8.5 kg/cm2g as per SOW A13." | 3 | Nos | 4,32,829.28 ₹15,32,215.65 Lowest | 7,00,000 ₹24,78,000 |
| 1.06 | Servicing cost for "Effecting Pipeline upgradations to mitigate the bottlenecking of higher MP flash gas pressure in GSU trains by resizing/rerouting flash gas header and fuel gas disposal header to maintain about 5.5 kg/cm2g against current pressure of 7.5-8.5 kg/cm2g ." | 3 | Nos | 1,19,466 ₹4,22,909.64 Lowest | 4,00,000 ₹14,16,000 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
10 Jul 2025, 3:00 pmClosed
GM(P), Area Manger ERG(O)
ONGC HAZIRA PLANT SURAT 394518
Effecting pipeline upgradation to divert gas from seal oil traps of 10 K 105 in LPG plant And fire water line for running IA IG compressors for cooling purpose And mitigate the bottlenecking of higher MP flash gas pressure in GSU at ONGC Hazira Plant
2025_ONGC_238812_1
8U1RC25003
Open Tender
Pipes and Pipe related activities
Works
365 days
ONGC HAZIRA PLANT SURAT
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2.3 L
27 Aug 2025
19 Jun 2025
11 Jul 2025
19 Jun 2025
10 Jul 2025
19 Jun 2025
19 Jun 2025 - 29 Jun 2025
Amount
Effecting Pipeline Upgradation
Supply of material for " Effecting Pipeline upgradations to divert gas from Seal Oil traps of Lean gas compressors (K103 A/B) and Propane Compressor (K-105) from existing flare header to fuel gas KOD/LP gas header and 1st stage suction respectively in LPG plant as per SOW A3".
Servicing cost for "Pipeline upgradations to divert gas from Seal Oil traps of Lean gas compressors (K103 A/B) and Propane Compressor (K-105) from existing flare header to fuel gas KOD/LP gas header and 1st stage suction respectively in LPG plant".
Supply of material for "Effecting Pipeline upgradations for laying of fire water line for running IA/IG compressors for cooling purpose in case of black out situations as per SOW A9".
Servicing cost for "Effecting Pipeline upgradations for laying of fire water line for running IA/IG compressors for cooling purpose in case of black out situations ."
Supply of material for "Effecting Pipeline upgradations to mitigate the bottlenecking of higher MP flash gas pressure in GSU trains by resizing/rerouting flash gas header and fuel gas disposal header to maintain about 5.5 kg/cm2g against current pressure of 7.5-8.5 kg/cm2g as per SOW A13."
Servicing cost for "Effecting Pipeline upgradations to mitigate the bottlenecking of higher MP flash gas pressure in GSU trains by resizing/rerouting flash gas header and fuel gas disposal header to maintain about 5.5 kg/cm2g against current pressure of 7.5-8.5 kg/cm2g ."
Damodhartech international Pvt Ltd (BID ID -868681)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .