Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | -25.00% | ₹10.7 L | L1 | Admitted-Finance |
| 2 | L2₹11.5 LAdmitted-Finance | -20.00% | ₹11.5 L | L2 | Admitted-Finance |
| 3 | L3₹11.5 LAdmitted-Finance | -19.89% | ₹11.5 L | L3 | Admitted-Finance |
| 4 | L4₹12.1 LAdmitted-Finance | -15.23% | ₹12.1 L | L4 | Admitted-Finance |
| 5 | L5₹12.2 LAdmitted-Finance | -14.55% | ₹12.2 L | L5 | Admitted-Finance |
Tender Value
₹14.3 L
EMD Value
₹28,646
Closing Date
24 Dec 2025, 6:00 pmClosed
DC(Works)/Executive engineer
Frontier HQ BSF Jammu Campus Paloura
Providing Water Supply Pipe Line from Existing Sump near Jawan Barrack of SHQ to Sump near Communication Complex of 134 Bn BSF under SHQ BSF Sunderbani
2025_BSF_888643_1
201/NIT/FTR-JMU/2025-26
Open Tender
Civil Works - Water Works
120 days
SHQ BSF Sunderbani
As per NIT
12 documents required · 12 mandatory
₹0
₹28,646
Yes
5 May 2026
5 Dec 2025
26 Dec 2025
5 Dec 2025
24 Dec 2025
5 Dec 2025
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. : External work, 80 mm dia. nominal bore
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 80 mm nominal bore
Constructing masonry Chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.l. surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size ), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design: With common burnt clay F.P.S.(non modular) bricks of class designation 7.5
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) 80 mm nominal bore
Modified estimated cost after using correction factor on DSR 2023 @ 0.973, S No. (1 to 4)
Add approved Cost index over DSR 2023 @ 19.63% on S No (1 to 5)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_934028.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid