Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed | |
| 2 | L2₹33.6 L+₹1.2 L (3.69%)Rejected-AOC | L2 | Rejected-AOC Agreement Executed | |
| 3 | L3₹40.2 L+₹7.9 L (24.3%)Rejected-AOC | L3 | Rejected-AOC Agreement Executed | |
| 4 | L4₹42.2 L+₹9.9 L (30.5%)Rejected-AOC AR CONSTRUCTIONS | L4 | Rejected-AOC Agreement Executed |
Tender Value
₹38.4 L
EMD Value
₹50,000
Closing Date
14 Oct 2024, 5:00 pmClosed
Executive Engineer
PWD Roads Division Palakkad
GENERAL-Reconstruction of damaged retaining wall at KM 13 120 (LHS) 19 350 (LHS) in Nemmara- Nelliyampathy road in Nemmara LAC-Work
2024_PWD_694371_1
PWD/RD/2020/3074/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Palakkad
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
20 Dec 2024
4 Oct 2024
17 Oct 2024
4 Oct 2024
14 Oct 2024
4 Oct 2024
Amount
Reconstruction of damaged retaining wall at Km. 13/120 (LHS)
12.1.A.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3 m - Manual Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.1.2.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Rock (not requiring blasting ) - Depth up to 3 m - Manual Means
OD210271/2022-2023:Providing 20mm dia dowel bars with TMT rods 2.00m long and 0.80 m into the rock and 1.20 m (0.8m +0.4m) into the concrete @1.00m c/c wherever found necessary as per the technical drawing including cost of materials, labour charge conveyance etc. complete
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD210270/2022-2023:Providing weep holes in Plain/ Reinforced concrete abutment,wing wall/return wall with 75mm dia PVC pipe(4kgf/cm2), extending through full width of structure with slope of 1V:20H, complete as per drawing and technical specification
OD210269/2022-2023:Back filling behind retaining wall, abutment, wing wall and return wall complete as per drawing and Technical Specification with department earth obtained from earth work excavation and excess earth removed from road berm
4.2.A.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub-base - Mix in Place Method
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Reconstruction of damaged retaining wall at Km. 19/350 (LHS)
12.1.A.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3 m - Manual Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.1.2.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Rock (not requiring blasting ) - Depth up to 3 m - Manual Means
OD210275/2022-2023:Providing 20mm dia dowel bars with TMT rods 2.00m long and 0.80 m into the rock and 1.20 m (0.8m +0.4m) into the concrete @1.00m c/c wherever found necessary as per the technical drawing including cost of materials, labour charge conveyance etc. complete
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD210273/2022-2023:Back filling behind retaining wall, abutment, wing wall and return wall complete as per drawing and Technical Specification with department earth obtained from earth work excavation and excess earth removed from road berm
OD210274/2022-2023:Providing weep holes in Plain/ Reinforced concrete abutment,wing wall/return wall with 75mm dia PVC pipe(4kgf/cm2), extending through full width of structure with slope of 1V:20H, complete as per drawing and technical specification
4.2.A.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub-base - Mix in Place Method
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
C. Prasad
Ramakrishnan
AR CONSTRUCTIONS
Bidder Name
Ramakrishnan
BHARATHAN P
C. Prasad
AR CONSTRUCTIONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .