Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | L1 | Accepted-AOC Work awarded | |
| 2 | L2₹17.0 L+₹64,273.45 (3.92%)Rejected-AOC | L2 | Rejected-AOC Work awarded to L1 | |
| 3 | L3₹17.9 L+₹1.5 L (9.22%)Rejected-Finance | L3 | Rejected-Finance Lowest bid accepted | |
| 4 | L4₹18.0 L+₹1.6 L (9.56%)Rejected-Finance | L4 | Rejected-Finance Lowest bid accepted | |
| 5 | L5₹18.4 L+₹2.0 L (12.4%)Rejected-Finance | L5 | Rejected-Finance Lowest bid accepted |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
16 Jan 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Buildings Division, Kozhikode
GENERAL SR work to Open terrace GI sheet roof work and Handrail work at Dental Hostelattached to Govt Medical College Kozhikode General Civil Work
2025_PWD_724440_1
61/EEBK/2024-25
Open Tender
Civil Works - Buildings
Item Rate
180 days
Medical college
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
28 Feb 2025
9 Jan 2025
18 Jan 2025
9 Jan 2025
16 Jan 2025
9 Jan 2025
Amount
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
12.51.2:Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05%) total coated thickness, zinc coating 120 grams per sqm as per IS:mm(+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete:Flashings / Aprons (Upto 600 mm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD215786/2024-2025:Dry rubble masonry with hard stone in foundation and plinth level
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
SAJI P (BID ID -2063756)
Highland Builders and Developers LLP (BID ID -2063107)
Santhosh Kumar K.V. (BID ID -2062814)
Nellikkaparamba Labour Contract Co-operative Society Ltd No D 3188 (BID ID -2063184)
JAITHRAN N (BID ID -2063741)
Bidder Name
Santhosh Kumar K.V.
SAJI P
Nellikkaparamba Labour Contract Co-operative Society Ltd No D 3188
manakkal madhavan
Highland Builders and Developers LLP
JAITHRAN N
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1150422.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .