Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.4 LAccepted-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹33.9 L+₹54,450 (1.63%)Rejected-Finance WZ 88A JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | NEW DELHI | DELHI | 110064 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹40.9 L+₹7.6 L (22.6%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹46.8 L+₹13.4 L (40.2%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹52.3 L+₹18.9 L (56.7%)Rejected-Finance | L5 | Rejected-Finance Being L5 |
Tender Value
Refer Docs
EMD Value
₹90,940
Closing Date
19 Dec 2020, 6:00 pmClosed
GE (AF) PALAM
GE (AF) PALAM, DELHI CANITT-10
GENP-39/2020-21 MANNING AND OPERATION OF LIFTS AND ELECTRICAL INSTALLATIONS IN ROCK VIEW AREA AND CAMP AREA UNDER GE (AF) PALAM, DELHI CANTT-10
2020_MES_382783_2
GENP-39/2020-21
Open Tender
Miscellaneous Services
Item Rate
330 days
GE (AF) PALAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) PALAM
₹90,940
Yes
16 Jan 2021
3 Dec 2020
21 Dec 2020
3 Dec 2020
19 Dec 2020
7 Dec 2020
Amount
All as per item No 1.00 above but for SRE towers located at CPRU (one lift) Technical area at AF Station Palam for one shift (each shift of 08 hours) by deploying Lift attendant (Semi-skilled) for duration of shifts as under:- The details of Lift attendant (Semi-skilled ) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0800 hrs to 1600 hrs (One Lift attendant ) Total shifts= 330x1= 330
All as per item No 1.00 above but for SRE towers located at located at 101 AW complex (one lift) Technical area at AF Station Palam for one shift (each shift of 08 hours) by deploying qualified Lift attendant (Semi-skilled) for duration of shifts as under:- The details of Lift attendant (Semi-skilled deployed are as under :- (i) 1st shift ( 8 Hrs) - 0800 hrs to 1600 hrs (One Lift attendant ) Totals= 330x1= 330
Manning and operation of electrical installations by engaging the qualified tradesmen with proper tools and safety devices in three shifts (each shift of 08 hours) for Rock View are Sub-stations all as specified and directed by Engr-in-Charge (a) The details of Electrician (skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One Electrician) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One Electrician) (ii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One Electrician) Total shifts= 330x3= 990 (b) The details of Mate Electrician (Semi-skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One mate electrician) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One mate electrician) (ii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One mate electrician) Total shifts= 330x3= 990
Manning and operation of electrical installations by engaging the qualified tradesmen with proper tools and safety devices in three shifts (each shift of 08 hours) for Camp area, Maude Line ,MAP,CNWP and CEWAC Sub-Stations all as specified and directed by Engr-in-Charge (a) The details of Electrician (skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One Electrician) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One Electrician) (ii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One Electrician) Total shifts= 330x3= 990 (b) The details of Mate Electrician (Semi-skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One mate electrician) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One mate electrician) (ii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One mate electrician) Total shifts= 330x3= 990
Total Shifts from item No 01 to 05 :- (a) Electrician (Skilled labour) =990 Shifts +990 Shifts=1980 Shifts (a) Lift attendant/Mate Electrician (Semi-skilled ) =990 Shifts +330 Shifts+ 330 Shifts +990 Shifts+990 Shifts = 3630 Shifts
Rate for Electrician (skilled) per person per day .
Rate for Mate Electrician (Semi-skilled) per person per day .
Notes for item No 01 to 05 (Contd...) : - (j) Daily cleaning of installation of inside/ outside area should be carried out by the worker/ tradesman of installation and material like dasuti/yellow cloth, broom, axis pic, spade, grass cutter etc shall be provided by the contractor. (k) It is sole responsibility of contractor to open “Aadhar Linked Bank Account” of all his person employed at site/work places. Details of payment made to workers in each month will be submitted to Engr-in-Charge in monthly pay sheet within 15th of every month, failing which a penalty of Rs 5000/- per month per worker shall be imposed on contractor. Payment to the workers shall be made by the contractor as per existing Govt wages directly through their bank accounts . (l) In case of absence of any worker, an amount @ Rs. 2000 per person per shift or part thereof shall be recovered from the contractor’s dues as penalty and no payment shall be made to the contractor at contract rates for that particular shift(s). This penalty is in addition to any other penalty/recovery mentioned in the CA. (m) Contractor will arrange proper insurance for the tradesman and department shall not be held responsible for paying any compensation incase of any fatal accident. Any dispute with tradesman under labour act will be dealt with by the contractor with labour commissioner/ appropriate authority. (n) Staff employed at any installation can be shifted/detailed by the JEs/ Engr-in-charge wherever required in the interest of services at no extra cost. (o) 10% amount will be deducted for " Not maintained log book/Duty roaster,Non submission of requisite documents,disobey order or any duty etc assigned by JEs/Engr-in-Charge." (p) All bidders must note that minimum fare wages rate shall be reckoned as per latest circulation of Chief Labour Commissioner/ State Govt./ Union territory whichever is higher at the time of bid submission end date. It is the sole responsibility of contractor to disburse minimum fare wages to labourers according to increase rate if any during contract period. The above facts shall deemed to be included in the quoted rates and nothing extra is admissible on above account.
Notes for item No 01 to 05 (Contd...) : - (q) The rates quoted shall be inclusive of all taxes, levies as applicable including GST. (r) The contractor has to submit the proof of authentic document in support of ‘contribution towards EPF’ and ‘contribution towards ESIC’ such as Electronic Challan Cum Receipt of ESI and EPF Challan to the Govt. treasury at the time of claim of RAR/ Final Bill. The contractor is required to submit the EPF & ESI number of individual employee at the time of claim of RAR/ Final Bill. (s) The Government of India vide their Notification No F.No 1/20(3)/2020-LS-II dated 12 Oct 2020 has notified minimum fair wages to be paid to the labour. The rate analysis has been done based on minimum fair wages which is kept in the office of GE. If the contractor quotes rates less than minimum fair wages, then the fixed deposit of the difference amount rounded up near one thousand i.e. Amount based on Rate Analysis (-) Minus Quoted Rates will be deposited for a period not less than 03 years within 15 days from the date Acceptance failing which the same shall be deducted from the contractor's dues i.e RAR/Final bills. The Accepting Officer has full power to accept any tender as per rates in vogue. The rates quoted by the tenderer shall include the above provisions and nothing extra will be paid on these accounts.
SANWARIYA ENTERPRISES
GURBUX SINGH AND CO.
M/s Dhapola Elevator and Engineering
DHAIRYAE ENTERPRISES
Leo Network power systems
M/S Anand Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .