Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67,409Accepted-AOC KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | ₹67,409 | L1 | Accepted-AOC L1 |
| 2 | L2₹69,158.40+₹1,749.40 (2.60%)Rejected-AOC ARUNODAYAM H KAYANNA BAZAR PO 673525 | KOZHIKODE | KERALA | 673525 | ₹69,158.40+₹1,749.40 (2.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | N.P. KANARAN L1 | CHANDRAN.C.H L2 |
|---|---|---|---|---|---|
| 1.00Emergency Work | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,000 | sqm | 18.23 ₹18,230 | 18 ₹18,000 Lowest |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 12 | each | 2,456.86 ₹29,482.32 Lowest | 2,600 ₹31,200 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 31.68 | cum | 360.15 ₹11,409.55 | 360 ₹11,404.8 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 63.36 | cum | 130.8 ₹8,287.49 Lowest | 135 ₹8,553.6 |
Tender Value
₹61,844
EMD Value
₹1,546
Closing Date
5 Feb 2026, 6:55 pmClosed
Assistant executive Engineer
o/o Assistant executive Engineer KyIP Subdivision Vatakara
GENERAL-KyIP ACP (NP) 2025-26Emergency Work- Removal of Slipped earth and jungle clearing in between Ch.2/500 and 2/700 of Naderi Distributary.-General Civil Work
2026_Irrig_831671_1
IRR/PI/TR/2354/2025_5_17_16/1
Open Tender
Civil Works - Canal
Item Rate
90 days
Naderi
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,546
Yes
30 Jul 2026
29 Jan 2026
7 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
Emergency Work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1397581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.76 MB
BOQ_1397581.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .