Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VPO BERI SUB TEHSIL BHOTA DISTT HAMIRPUR HP | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE DAK P O DAHAB TEHSIL FATEHPUR DISTT KANGRA H P 176051 | DAHAB | KANGRA | HIMACHAL PRADESH | 176051 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.4 L
EMD Value
₹18,720
Closing Date
13 Mar 2020, 4:00 pmClosed
EE HIMUDA DIVISION DHARAMSHALA
HIMUDA DIVISION DHARAMSHALA
Construction of Vertical Rope Chin up Bar Site up Bar Pipe Structure and 17 feet shuttle track at PTC Daroh Distt Kangra HP
2020_HIMUD_36055_1
NO HIMUDA DD CB 7420 45 DT 27 02 2020
Open Tender
Civil Works
Item Rate
90 days
DHARAMSHALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
Yes
EE HIMUDA DIVISION DHARAMSHALA
₹18,720
Yes
15 Jul 2020
7 Mar 2020
16 Mar 2020
7 Mar 2020
13 Mar 2020
7 Mar 2020
Amount
Excavation in foundations, trenches etc. in earth work in all kinds of soils such as pick work, jumper work, and chiselling / wedging out of hard or soft rock up to all depths stacking the excavated soil not more than 3 meteres clear from the edge of excavation and then returning the stacked soil in 15 cms layers, when required into plinths, sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing off all surplus excavated earth as directed by the Engineer-in- charge.
Dressing the ground including cutting and filling upto 15cm in all kinds of soil as directed by the Engineer-in- charge including carriage of material in all leads & lifts.
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete including cost of sand including carriage of material in all leads & lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron frames 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping, etc. with wooden battens and ballies heights of propping and centering below supporting floor to ceiling in all heights and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of material in all leads & lifts. (a) Foundation, footing bases of columns etc. and mass concrete.
(b) Edges of slabs and breaks in floors and walls under 20cm wide.
(c) Column pillar, posts and struts square, rectanagular or polygonal in plan.
Providing and laying cement concrete 1 : 6 : 12 (1 cement : 6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete on slab and floor excluding cost of form work in foundation and plinth including carriage of material in all leads & lifts.
Providing and laying cement concrete 1 : 4 : 8 (1 cement : 4 sand : 8 graded stone aggregate 40 mm nominal size) and curing complete on slab and floor excluding cost of form work in foundation and plinth including carriage of material in all leads & lifts.
Providing and laying cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curring complete excluding cost of form work and reinforcement for reinforced concrete work including carriage of material in all leads & lifts.(a) Foundations, footings, bases of column and the like and mass concrete.
(b) Column, pillars, posts and struts upto all heights
Providing Tor steel/TMTsteel reinforcement for R.C.C. work including bending,binding and placing in position complete including cost of binding wire including carriage of material in all leads & lifts.
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 sand : 4 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material in all leads & lifts.
Providing and fixing 0.60mm thick prepainted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating including fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete with all accesoriees as required as per the direction of Engineer-in-charge including carriage of material in all leads & lifts.
Providing and fixing ridges or hips 60 cm overall with 0.60mm thick prepainted steel sheets in roofing with hot dipped metalic zinc coated sheets with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating including fixing with prepainted iron J or L hooks, bolts & nuts 6mm dia & prepainted G.I. limpet and bitumen washers complete with all accessories as required as per the direction of Engineer in Charges including carriage of material in all leads & lifts.
Providing and fixing valley 60 cm overall 0.60mm thick prepainted steel sheet in roofing with hot dipped metalic zinc coated sheet with top coat of regular modified polyster organic coating of back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia with prepainted G.I. limpet and bitumen washers complete with all accessories as required as per the direction of Engineer-in-charge including carriage of material in all leads & lifts.
Steel work welded in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of red lead paint including carriage of material in all leads & lifts. (a) In beams, joists, channels angles, tees, flats with connecting plates or angle cleats in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like.
Steel work welded in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of red lead paint including carriage of material in all leads & lifts. (a) In tubular section with connecting plates or angle cleats in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like.
Applying priming coat over new steel and other metal surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes fine steel wool scrapers and sand paper complete with ready mixed priming paint brushing red lead, red oxide/ zinc oxide chrome including carriage of material in all leads & lifts.
Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter : Enamel paint other than white/ white paint including carriage of material in all leads & lifts.
AASHISH KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .