Loading…
Loading…
Tender Value
₹5.3 L
EMD Value
₹6,700
Closing Date
17 Jul 2026, 6:00 pm5d left
PAWAN KUMAR
KEDLA WASHERY
04 nos. joint preparation, 02 nos. GC-10 Gear coupling changing 04 nos. bend drum lagging and 190 nos. frame repairing of unit no. 116B and133B of Pre-Washery
2026_CCL_361700_1
PO/KW/E-Tender/26-27/05, Date- 06.07.2026
Open Tender
Electrical and Maintenance Works
20 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,700
Yes
6 Jul 2026
6 Jul 2026
18 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
7 Jul 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 04 nos. Joint preparation take-up lifting/dismantling & re-installation and 02 nos. gear coupling changing. (a) Take-up lifting/dismantling cost and gear coupling. | 20.4 | MT | - | - |
| 2 | (b) Take-up re-installation cost and Gear box & coupling installation cost. | 20.4 | MT | - | - |
| 3 | 04 nos. drum lagging and 190Nos. Idler frame repairing. (a) Take-up lifting/dismantling cost and Roller dismantling cost. | 20.41 | MT | - | - |
| 4 | (b) Frame bracket dismantling cost. | 3.89 | MT | - | - |
| 5 | (c) Frame fabrication & erection cost. (3.889+1.214MT) | 5.1 | MT | - | - |
| 6 | (d) Take-up re-installation cost and Roller installation cost. | 20.41 | MT | - | - |
| 7 | (e) Frame & roller shifting cost.(3.889+1.214+8.442MT)= | 13.55 | MT | - | - |
| 8 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_374586.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid