Loading…
Loading…
Tender Value
₹14.9 L
EMD Value
₹29,860
Closing Date
11 Jun 2026, 6:00 pm6d left
Regular Maintenance of Rising and distribution pipe line at various UWSS / RWSS under JEn Section-2nd Bansur of Subdivision Bansur under division Bansur
2026_PHCJA_564022_3
EEPHEDBANSUR-06-10/2026-27
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
365 days
bansur
E-grass Challan, Registration, GST registration, Annexures, supporting document etc as per TD
2 documents required · 2 mandatory
₹1,000
MD RISL
₹29,860
Yes
2 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
11 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of BLakh top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.Jointing material shall be provided by the department | ||||||
| 1.1 | 101 km to 200 km - Two fitter-II & Four beldar (Minimum Labour for a following Kms pipe lines to be deployed) at various WSS under jen section 2nd
Total = 158 km x 12 month = 1896 KM | - | Per KM Per Month | 787 | - | BI01010001010000000000000515BI0100001115 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
08td.pdf
Tender Documents • 1.99 MB
BOQ_1004027.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid