| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 LAccepted-AOC VILL GOBINDAPUR EAST KAILASHAHAR UNAKOTI TRIPURA | L1 | Accepted-AOC L1 |
Tender Value
₹28.3 L
EMD Value
₹56,586
Closing Date
22 May 2026, 3:00 pmClosed
EE, DWS Division,KGT
EE, DWS Division,KGT
Construction of 01 No. 15000 GPH capacity package type Iron Removal Plants attached to existing deep tube well at East Durgapur W- 17 under Kailashahar Municipal Council Area under DWS Sub-Division, Kailashahar
2026_CEDWS_72881_1
DNIeT No_23/SE/DWS/C/KGT/2025-26
Open Tender
Civil Works
Percentage
90 days
Unakoti
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹56,586
5 Oct 2026
14 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, installation and commissioning of package type Iron Removal Plant comprising of Iron Removal Filter of dual media filter with anthracite coal, filter gravel, polypropelene double hexagonal nut strainer etc., mixing chamber for coagulants like sodium alluminates etc., oxidation chamber with manganese dioxide , metering pump for coagulant dosing, air compressor of suitable capacity with motor, back washing arrangements, disinfection with sodium hypochlorite solution through metering pump, all necessary pipes for raw water collection, inter connecting all the chambers, delivery outlet of 150 mm dia alongwith all related civil, mechanical and Electrical works etc. complete as per approved drawing, process flow, technical specification and direction of the Engineer - in - charge.
(A)15000 G.P.H. capacity | 1 | No | 24,14,100 | ₹24,14,100 |
| 2 | SH:- Semi Parmanent Pump Shed including boundary fencing, plinth protection etc.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All Kinds of Soil | 17.67 | Cum | 231.6 | ₹4,092.37 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (A) All kinds of soil | 11.78 | Cum | 161.3 | ₹1,900.11 |
| 4 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 5.37 | Cum | 1,177.3 | ₹6,322.1 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. (a) All work upto plinth level. (i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded brick aggregate 20 mm nominal size) cum well burnt | 4.5 | Cum | 10,742.6 | ₹48,341.7 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: (i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size | 0.55 | Cum | 11,080.4 | ₹6,094.22 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement. (i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size | 0.47 | Cum | 12,591.1 | ₹5,917.82 |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for. (ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 14 | Sqm | 391 | ₹5,474 |
| 8.01 | iv) Weather shade, Chajjas, corbels etc., including edges. | 10 | Sqm | 531.3 | ₹5,313 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth Level level. ( i) Thermo -Mechanically Treated bars of gradeFe-500D or more | 40 | Kg | 103.9 | ₹4,156 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74165.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_74165.xls
BOQ • 0.36 MB
DNIeT23SE.pdf
Tender Documents • 2.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .