| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance VILL ANARA DIST PURULIA WEST BENGAL | PURULIA | WEST BENGAL | ₹1.7 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹1.7 LRejected-Finance RANIBANDH BARIKUL BANKURA | BANKURA | WEST BENGAL | 713142 | ₹1.7 L | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹1.7 LRejected-Finance VILL FULKUSHMA P O FULSUSUNIA DIST BANKURA PIN 722162 | BANKURA | BANKURA | WEST BENGAL | 722162 | ₹1.7 L | L4 | Rejected-Finance L4 BIDDER |
| 5 | L5₹1.8 LRejected-Finance VILL ASTAPARA P O KADODIHA DIST JHARGRAM PIN 721505 | ASTAPARA | JHARGRAM | WEST BENGAL | 721505 | ₹1.8 L | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹1.7 L
EMD Value
₹3,499
Closing Date
16 Feb 2026, 5:30 pmClosed
The Executive Engineer
Purulia Construction Division (Irrigation) Bhatbandh Irrigation Colony Ranchi Road, PO. and Dist.-Purulia.
M/R to RBMC within Chainage 60.00 and Ch. 70.00 of Beko Irrigation Scheme under PCSD-I of Purulia Construction Division (Irrigation)
2026_IWD_997474_10
WBIW/EE/PUAIWA001/e-NIT7/25-26
Open Tender
CIVIL WORKS
30 days
KASHIPUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,499
14 Mar 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge a) Local soil/ soil mixed with moorum or kankar/ silt, dry or moist, slushy silt/ sticky soil.
Earthwork in excavation of foundation trenches or drains, inall sorts of soil (includingmixed soil but excluding lateriteor sandstone) including removing, spreading or stacking the spoils within alead of75m. as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Cast-in-situ cement concrete blocks or lining units as per designed size and specification in nominal mix proportion 1:1.5:3 (corresponding to M20 Grade), with well graded 20 mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 Ҷm to act as a separator between the bottom surface of the block and the sand cushion/ filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without any additional cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/filter. (The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete). With Stone aggregatesl (Pakur, North Bengal or Rajmahal varieties)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
Water Bound Macadam Base Course : Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii)Grading-I Aggregate (63 mm to 45 mm) Using Stone Screening Type B (11.2 mm) B. Manual Means
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Note: Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2449555.xls
BOQ • 0.38 MB
2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid