EXECUTIVE ENGINEER CAPITAL PROJECT DIVISION NO.1 GANDHINAGAR
2216 M & R Construction of New pipe in Wash Basin area and Renovation of Paver Blocks, China Mosaic, Pipe Network of Terrace etc. at Shyamji Krishna Varma park, Sector-7, Gandhinagar.
295631
Tender Notice No.1/2 of 2025-26
Open
Civil - All
Works
Gandhinagar
8 documents required · 8 mandatory
₹2,400
Ex. Engineer, C.P. Div. No.1, Gandhinagar.
₹83,200
9 Apr 2026
9 Apr 2026
9 Apr 2026
22 Apr 2026
9 Apr 2026
MEMORANDUM SHOWING THE ITEM OF WORK TO BE CARRIED OUT
It. Quantities Item of Work Estimated Rates Unit Total amount
It. Quantities Item of Work Estimated Rates Unit Total amount
No. estimated but In Figures In Words according to
may be more Rs./ Paise estimated
Providing and fixing PVC SWR Nahni trap IS 14735 Rupees Five
for drain - 75 mm diameter with jali of the following Hundred EightySix
1 336.00 nominal diameter of self cleansing design with C.I 586.27 Paise TwentySeven Nos
scread down or hinged grating including the cost of Only
cutting and making good the walls.
PVC SWR pipes IS 13592 for Drain - 75 mmdia Rupees One Hundred
FourtyFour Paise
Laying, fixing and jointing PVC SWR pipes IS 13592 Rupees ThirtyNine
for Drain - 75 mmdia and specials of following class Paise ThirtySeven
and diameter like Piipe Bend 87.5 degree with door, Only
3 1680.00 Vent Cowl, Single Y", Pipe Clamp, Coupler etc 39.37 Rmt
including cost of conveyance from stores to site of
works including cost of labour, material, solvent as per
PVC SWR Piipe Bend 87.5 degree with door for 75 Rupees ThirtySeven
mm diameter Paise SixtySix Only
PVC SWR Vent Cowl 75 mm dia Rupees Nine Paise
It. Quantities Item of Work Estimated Rates Unit Total amount
It. Quantities Item of Work Estimated Rates Unit Total amount
No. estimated but In Figures In Words according to
may be more Rs./ Paise estimated
PVC SWR Single Y" - 75 mm dia" Rupees FiftyEight
6 336.00 58.21 Paise TwentyOne Nos
PVC SWR Piipe clamp 75 mm Rupees Eight Paise
PVC SWR Coupler 75 mm dia Rupees TwentyEight
8 384.00 28.25 Paise TwentyFive Nos
Providing necessary labours for removing, cleaning, Rupees FiftyFour
stacking etc for existing paver block, and also Paise ThirtySix Only
cleanintg the site as approved by Engineer In Charge.
Providing and fixing pre-cast Rubber Dye / steel Dye Rupees Seven
interlocking concrete block 60mm thick with grade of Hundred Six Paise
concreteM300 pnumatic compressed / vibrated Ninety Only
mechanically and asper approved design Confirming to
IS 15658 : 2006including 35 mm Sand layer for
levelling and filling thejoint with sand in proper line
and level as per guidlines ofIRC : SP 63-2018 etc.
Refixing of existing pre-cast Rubber Dye / steel Dye Rupees Two
inter locking concrete block 60mm thick with grade of Hundred
concrete M300 pnumatic compressed / vibrated SeventyTwo Paise
mechanically and as per approved design Confirming EightyFive Only
to IS 15658 : 2006 including 35 mm Sand layer for
levelling and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-2018 etc.
It. Quantities Item of Work Estimated Rates Unit Total amount
It. Quantities Item of Work Estimated Rates Unit Total amount
No. estimated but In Figures In Words according to
may be more Rs./ Paise estimated
Providing necessary labours for removing, cleaning, Rupees One Hundred
stacking, scraping the surface etc for existing chine SixtyThree Paise
mosaic and also cleanintg the site as approved by Seven Only
Engineer In Charge.
Providing and laying broken chine mosaic flooring for Rupees Seven
terrace using 12 mm to 20 mm broken pieces of glazed Hundred
tiles to be laid over cement mortar 1:3 to plain or slope SeventyNine Paise
and to be tempered to bring mortar creme out upto Seventy Only
surface using white cement including rounding off
junctions and extending them upto 15 cm along the
wall, clearing with water and oxalic acid etc. as
Providing and laying cement concrete flooring 1:2:4 (1- Rupees Three
cement : 2-coarse sand : 4-graded stone aggregate Hundred SixtyNine
14 5646.35 20mm nominal size) laid in one layer and finished with 369.13 Paise Thirteen Only Sqm
a floating coat of neat cement. (A) 50mm thick.
Providing laying and jointing in true line and level Rupees One Hundred
50mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water NinetyFive Paise
including fittings as approved by Engineer In Charge. SixtySeven Only
Pipe shall be fixed on the wall with the help of clamp
15 1261.80 at every two metre C/C or shall be concealed as 195.67 Rmt
directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
It. Quantities Item of Work Estimated Rates Unit Total amount
It. Quantities Item of Work Estimated Rates Unit Total amount
No. estimated but In Figures In Words according to
may be more Rs./ Paise estimated
Providing necessary labours for making ways for water Rupees One
by jointing pipes and making water tank isolate for Thousand Ten Only
providing space for water proofing work of terrace as
approved by Engineer In Charge.
Appling water proofing treatment to terrace slab Rupees NinetyNine
portion by appling two coat Acrylic polymer base Paise ThirtyTwo
17 3384.60 water guard chemical approved by engineer in charge 99.32 Only Sqm
applied with brush after cleaning dirt, dust and other
forein material.
Providing and fixing each valve in pipe network with Rupees Five
all adhesive and necessary material as directed by Thousand Six
Engineer in Charge. (ball Valve of 1 1/2 inch dia and Hundred NinetySix
2 inch dia) Paise Fourty Only
Providing and fixing each NRV valve in pipe network Rupees Three
with all adhesive and necessary material as directed by Thousand Three
Engineer in Charge. (Non returning valve of 2 inch Hundred ThirtyThree
Providing and fixing pre-cast concrete kerb stone of Rupees Three
graycement based concrete block 30cm length,30cm Hundred
height and15cm thick of M200 grade concret as per NinetySeven Paise
approved designand including excavation for fixing in FiftyThree Only
proper line andlevel,filling the joint with C:M 1:3
(1cement:3fine sand) etccomplete.
Demolition including stacking of serviceable materilas Rupees One
and disposal of unserviceable materials with all lead Thousand One
and lift. (i)R.C.C. work Hundred Ten Paise
SeventyFive Only
It. Quantities Item of Work Estimated Rates Unit Total amount
It. Quantities Item of Work Estimated Rates Unit Total amount
No. estimated but In Figures In Words according to
may be more Rs./ Paise estimated
Providing laying and jointing in true line and level Rupees NinetyOne
25mmdia. U.P.V.C. Pipe ( SCH- 40) for cold water Paise EightyFour
includingfittings as approved by Engineer In Charge. Only
Pipe shall befixed on the wall with the help of clamp at
every two metreC/C or shall be concealed as directed
including necessaryfittings etc. including testing of
pipe and joints and fixingthe same withadhesive
solvent, including cost of allmaterials.
Constructing brick masonry chamber for underground Rupees Seven
C.I.Inspection chamber and bends with bricks having Thousand One
crushing strength not less than 35Kg/ Cm2 in C.M. 1:5 Hundred Eighty
C.I. cover with frame (Light duty) 455mm x 610mm Paise FourtyFour
intenal dimensions total weight of cover with frame to Only
be not less than 38Kg. (Wt. of cover 23 Kg.) and Wt.
of frame 15Kg. ) (R.C.C. top slabe with 1:2:4 mix (1-
23 1.00 cement :2- coarse sand :4-graded stone aggregate 7,180.44 Nos
20mm size) foundation concrete 1:5:10 inside plaster
15mm thick with cement mortar 1:3 finished smooth
with a floating coat of neat cement on walls and bed
concrete etc. complete.(iii) Inside dimensions 600mm
x 850mm and 450mm deep for pipe lines with three or
TOTAL CIVIL WORK AMOUNT
Rupees EightyThree Lakh Fifteen Thousand One Hundred FourtySix Paise TwentyTwo Only
I/We am/are willing to carry out the work at __________________________________% above/below ___________ percent (should be written in figures
and words) above/ below the estimated rates mentioned above. Amount of my/ our tender work out as under.
Estimated Amount Estimated Amount
Put to tender Rs. 8315146.22 Put to tender Rs.
Deduct % below Rs. Add % above Rs.
Total Rs. Total Rs.
Note 1 All the work shall be carried out as per Public works Department Hand Book and other specification of the Division or as directed.
Note 2 All the columns in the Schedule B filled in INK and the total of the entries in the last column should be struck by the Contractor under his Signature.
Note 3 Rate quoted include clearance of site (prior to commencement of work and at its close) in the respects and hold good for work under all conditions, site
moisture, weather etc. complete.
Dated Signature of the Deputy Executive Engineer
Contractor Capital Project Sub Division No.20
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 NIT.pdf
02 SBD Book.pdf
03 Schedule B.pdf
04 Specification.pdf
05 Test Schedule.pdf
07 Building Specification Booklet.pdf
06 Condition and GR_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .