Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAdmitted-Finance NEAR KHERDI GRAMPANCHAYAT OFFICE KHERDI CHIPLUN | CHIPLUN | MAHARASHTRA | ₹37.9 L | L1 | Admitted-Finance |
| 2 | L2₹39.0 LAdmitted-Finance 260 YASHWANT RAYSONS VILLA LIC COLONY ROAD TARABAI PARK E WARD KOLHAPUR 416003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | ₹39.0 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical GROUND FLOOR BUILDING NO 1 MORE COMPLEX ROHA KOLAD ROAD DHATAV RAIGAD MAHARASHTRA 402116 | RAIGAD | MAHARASHTRA | 402116 | - | - | Rejected-Technical Documentary evidence of ladder not submitted. |
| Sl No | Description | Qty | Unit | Thasale And Sons L1 | Shree siddhivinayak electricals Kolhapur L2 |
|---|---|---|---|---|---|
| 1.00 | Sub Estimate - M & R to Street light at Lote-Parshuram and Dapoli Industrial Area... Annual Comprehensive maintenance of street lights & Highmast in Lote-Parshuram & Dapoli industrial area …- Comprehensive Maintenance of street lights including providing licensed Electrician wiremen & labours for day to day checking, identifying & rectifying the faults in street light system, replacing of burnt accessories of street light LED fixtures, driver, LED panel, distribution box, wires, MCB'S, cables, earthing pipes, cables enclosure & straight joints etc. complete as directed by Engineer-in-Charge. | 10,776 | JOB PER MONTH | 268 ₹28.9 L | 275.4 ₹29.7 L |
| 2.00 | Sub Estimate - M & R to Street light at Dapoli-mini Industrial Area... Replacement and Annual Comprehensive maintenance of street lights in Dapoli industrial area … - 8.7 Dismantling - Dismantling the existing pole above 6 m height with brackets, clamps, insulators, stay from the c.c. foundation and making the site clear by refilling the pits with excavated materials and bringing it to the ground level. | 15 | each | 1,035 ₹15,525 | 1,063.86 ₹15,957.90 |
| 3.00 | C.C. Foundation - Making M-20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 6m to 8m high octagonal/conical GI pole). | 15 | each | 4,838 ₹72,570 | 4,970.46 ₹74,556.90 |
| 4.00 | Hot Dipped Galvanized Poles & High-Mast (OH-HM) - Providing & erecting 7 m high (clear height) galvanised octagonal pole with foundation bolts having bottom of 130 mm A/F, top 70 mm A/F on provided foundation as per specification no. OH-PL/OPL | 15 | each | 17,100 ₹2.6 L | 17,564.4 ₹2.6 L |
| 5.00 | Providing and erecting galvanised 1000mm single arm sword type bracket with FRP dome and ball as per specification no. OH-PL/BKT | 15 | each | 2,691 ₹40,365 | 2,764.2 ₹41,463 |
| 6.00 | Bunch of Wires (WG-MA/BW) -- Supplying and erecting PVC insulated PVC round sheathed FR 2.5 sq.mm (50 no. x 0.25mm dia.) 3 core flexible multi stranded copper industrial cable for voltage grade up to 1.1 kV | 135 | Meter | 110 ₹14,850 | 113.22 ₹15,284.70 |
| 7.00 | Cable Enclosures (CB-CE) - Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, complete. | 675 | Meter | 202 ₹1.4 L | 208 ₹1.4 L |
| 8.00 | Supplying & laying (including excavation) reinforced cement concrete pipe of NP-2 class of 150 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | 60 | Meter | 608 ₹36,480 | 625.26 ₹37,515.60 |
| 9.00 | LT Cables (Aluminum) (CB-LT/AL) - Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL | 800 | Meter | 181 ₹1.4 L | 186.66 ₹1.5 L |
| 10.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 15 | Cubic Meter | 426 ₹6,390 | 437.58 ₹6,563.70 |
Tender Value
₹38.2 L
EMD Value
₹38,200
Closing Date
29 Apr 2026, 5:00 pmClosed
SE E and M Comm Andheri, Mumbai
SE E and M Comm Andheri, Mumbai
DG LOTE PARSHURAM. M and R to Street light at Lote Parshuram and Dapoli Industrial Area. Annual Comprehensive maintenance of street lights and Highmast in Lote Parshuram and Dapoli industrial area
2026_MIDC_1295127_1
38,18,709.00
Open Tender
Support/Maintenance Service
Lote Parshurm Industral Area..
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹38,200
5 May 2026
15 Apr 2026
4 May 2026
15 Apr 2026
29 Apr 2026
23 Apr 2026
15 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Estimate - M & R to Street light at Lote-Parshuram and Dapoli Industrial Area... Annual Comprehensive maintenance of street lights & Highmast in Lote-Parshuram & Dapoli industrial area …- Comprehensive Maintenance of street lights including providing licensed Electrician wiremen & labours for day to day checking, identifying & rectifying the faults in street light system, replacing of burnt accessories of street light LED fixtures, driver, LED panel, distribution box, wires, MCB'S, cables, earthing pipes, cables enclosure & straight joints etc. complete as directed by Engineer-in-Charge. | 10,776 | JOB PER MONTH | 67,001 | ₹72,20,02,776 |
| 2 | Sub Estimate - M & R to Street light at Dapoli-mini Industrial Area... Replacement and Annual Comprehensive maintenance of street lights in Dapoli industrial area … - 8.7 Dismantling - Dismantling the existing pole above 6 m height with brackets, clamps, insulators, stay from the c.c. foundation and making the site clear by refilling the pits with excavated materials and bringing it to the ground level. | 15 | each | 67,001 | ₹10,05,015 |
| 3 | C.C. Foundation - Making M-20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 6m to 8m high octagonal/conical GI pole). | 15 | each | 67,001 | ₹10,05,015 |
| 4 | Hot Dipped Galvanized Poles & High-Mast (OH-HM) - Providing & erecting 7 m high (clear height) galvanised octagonal pole with foundation bolts having bottom of 130 mm A/F, top 70 mm A/F on provided foundation as per specification no. OH-PL/OPL | 15 | each | 67,001 | ₹10,05,015 |
| 5 | Providing and erecting galvanised 1000mm single arm sword type bracket with FRP dome and ball as per specification no. OH-PL/BKT | 15 | each | 67,001 | ₹10,05,015 |
| 6 | Bunch of Wires (WG-MA/BW) -- Supplying and erecting PVC insulated PVC round sheathed FR 2.5 sq.mm (50 no. x 0.25mm dia.) 3 core flexible multi stranded copper industrial cable for voltage grade up to 1.1 kV | 135 | Meter | 67,001 | ₹90,45,135 |
| 7 | Cable Enclosures (CB-CE) - Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, complete. | 675 | Meter | 67,001 | ₹4,52,25,675 |
| 8 | Supplying & laying (including excavation) reinforced cement concrete pipe of NP-2 class of 150 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | 60 | Meter | 67,001 | ₹40,20,060 |
| 9 | LT Cables (Aluminum) (CB-LT/AL) - Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL | 800 | Meter | 67,001 | ₹5,36,00,800 |
| 10 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 15 | Cubic Meter | 67,001 | ₹10,05,015 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.81 MB
ItemSpecification.pdf
Other Document • 0.04 MB
TenderDocument.pdf
Tender Documents • 0.35 MB
BOQ_2225297.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid