Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,500
Closing Date
8 Oct 2026, 6:00 pmClosed
DFO POONCH
Forest Complex Poonch
As per Nit and BoQ
2026_FD_326761_4
e-NIT No. 20 of 2026-27
Open Tender
Civil Works
Percentage
60 days
POONCH
Kindly refer attachment
2 documents required · 2 mandatory
₹500
DFO POONCH
₹4,500
1 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 69.7 | Sqm | 12.49 | ₹870.55 |
| 1.02 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 78.42 | Cum | 479.3 | ₹37,586.71 |
| 1.03 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shuttering, all works upto plinth level 1:5:10 (1cement : course sand : 10graded stone) aggregate 40mm nominal size crushed. | 4.77 | Cum | 4,826.5 | ₹23,022.41 |
| 1.04 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shuttering, all works upto plinth level 1:3:6 (1cement : course sand : 10graded stone) aggregate 40mm nominal size crushed. | 3.57 | Cum | 5,733.8 | ₹20,469.67 |
| 1.05 | Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete. | 5.86 | Sqm | 286.35 | ₹1,678.01 |
| 1.06 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 14.95 | cum | 5,402.9 | ₹80,773.36 |
| 1.07 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate. | 40.89 | Sq.m | 562.15 | ₹22,986.31 |
| 1.08 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 13.94 | Sqm | 416.5 | ₹5,806.01 |
| 1.09 | Carriage of materials from source to site of work by M.T. Sand av. 20 km and HL 500 mtr | 7.21 | Cum | 916.44 | ₹6,607.53 |
| 1.1 | Carriage of materials from source to site of work by M.T. Bajri av. 20 km and HL 500 mtr | 9.97 | cum | 916.44 | ₹9,136.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1105485.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .