Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Fee/PreQual/Technical/Finance AT NATIONAL ANGARPATHARA APC P O KATRASGARH DHANBAD JH 828113 | DHANBAD | JHARKHAND | 828113 | -40.51% | ₹2.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹15,293.33 (7.23%)Admitted-Fee/PreQual/Technical/Finance AT TELIYABANDH KATRAS AREA DHANBAD JH 828114 | DHANBAD | DHANBAD | JHARKHAND | 828114 | -36.21% | ₹2.3 L+₹15,293.33 (7.23%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.3 L+₹17,818.51 (8.42%)Admitted-Fee/PreQual/Technical/Finance AT SIJUA MORE P O SIJUA DHANBAD JH 828121 | DHANBAD | DHANBAD | JHARKHAND | 828121 | -35.50% | ₹2.3 L+₹17,818.51 (8.42%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.6 L
EMD Value
₹4,500
Closing Date
15 May 2026, 5:00 pmClosed
Area Civil Engineer
Katras Area Office
Fencing of BCCL Land under Katras Area
2026_BCCL_359109_1
GM/KA-IV/Civil/eNIT/2026-27/03
Open Tender
Civil Works - Others
Percentage
30 days
Katras Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,500
2 Jun 2026
5 May 2026
16 May 2026
5 May 2026
15 May 2026
5 May 2026
5 May 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | 214.15 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | 5,592.8 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth leve 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | 6,856.3 | ₹6,849.44 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.2 | kg | 75.65 | ₹15.05 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns | 1 | sqm | 247.95 | ₹247.7 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even
shade :
Two or more coats on new work | 1 | sqm | 103.6 | ₹103.5 |
| 7 | Lettering with black Japan paint of approved brand and manufacture | - | per letter per cm height | 4.25 | - |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_371975.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_371975.xls
BOQ • 0.27 MB
Corridendum03.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .