Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹1,811
Closing Date
16 Jul 2026, 6:00 pm
Executive Engineer, Public Health Works Division, Palanpur.
Miscellaneous work At. Ambaji HW For Ambaji 24 x 7 RWSS, Tal:-Danta, Dist : Banaskantha.
319925
09 of 2026-2027
Open
Civil Works - Water Works
Banaskantha
6 documents required · 6 mandatory
₹600
Executive Engineer, P. H. Works Division, Palanpur
₹1,811
2 Jul 2026
2 Jul 2026
2 Jul 2026
16 Jul 2026
2 Jul 2026
Name of work :- Miscellaneous work At. Ambaji HW For Ambaji 24 x 7 RWSS,
Tal:-Danta, Dist : Banaskantha.
SCHEDULE OF PAYMENT
COMMON CONDITIONS:
1.1 All petty items occurring if the work shall be carried out in workman like manner as
per specification published by G.W.S. & S. Board and as per general specification
current in the Division and as per instruction of the Engineer-in-charge from time to
1.2 Extra charge of claims in respect of extra work shall not be allowed unless such
works are ordered in written by the Engineer-in-charge and are claimed for in
specified manner before the work is taken in Hand.
1.3 The contractor shall engage on in experience and qualified supervisor as his
authorized agent for the work. He shall be responsible to take from time to time such
orders as may be given by the Engineer-in-charge to carry them.
1.4 As order book shall be maintained on the work site and the contractor shall sign the
orders given by the Engineer-in-charge and he shall carry out them promptly. The
order books shall be surrendered to the Department on completion of Work.
1.5 The contractor shall have to clear the site of work before it commences and after the
work is completed for which separate claim shall not be entertained.
1.6 In addition in the required stores the contractor shall provide at his own cost the
suitable temporary office shed with a covered area of about 20 sq mt. with
necessary furniture for the use of Government staff while in works. The shed and
furniture on completion of the work shall be removed by the contractor at his own
1.7 The contractor shall provide at his own cost all labour charges setting out the as
may be required for lining and setting out the as may be required for lining and
setting up the works satisfactory and adequate facilities site scaffolding etc. for
facility of checking his work or taking measurements etc.
1.8 Department shall give reasonable facilities to the contractor to enable him to obtain
controlled materials at controlled rates as may be fixed from time to time. The
contractor shall however not be entitled to time. The contractor shall however not be
entitled to claim any compensation extra time limit to account of non-supply at
controlled rates. The materials obtained shall be only used for the work in question.
GUJARAT WATER SUPPLY AND SEWERAGE BOARD
Any materials remaining surplus shall be neither disposed nor removed by the
contractor without obtaining written permission of Department to that effect.
Government shall have the right to take delivery of the surplus materials at the
original purchase price of the receipt contractor shall be sue of such materials to the
satisfaction of Engineer-in-charge and submit in monthly statement thereof.
1.9 The contractor at his own cost expense shall provide necessary housing
accommodation and the sanitary.
1.10 Arrangement for his staff and labour and shall pay direct of the authorities
concerned all rates. Taxes royalties and other charges.
1.11 The contractor shall also comply with the requirement of the Health Department as
regards anti malarial measures etc.
1.12 Water requires for the execution of work and for the water tightness test of the
reservoir shall be supplied by the contractor at his own cost in manner satisfactory
to the Engineer-in-charge of work.
1.13 The contractor shall not be entitled to claim compensation from the Government.
For works suffered on account of delay where such delay is caused either by;
(i) Difficulties relating to the supply of Railway Wagons,
(ii) Force majeure,
(iii) Acts of the God,
(iv) Any other reasonable caused beyond the control of the Department. In case of
delay Govt. shall however grant such extension of time limit for the completion
as may appear reasonable to the Engineer-in-charge and his decision shall be
1.14 The contractor shall be responsible to pay complete compensation to his staff and to
his labours according to the labour compensation rules, on account of accidents and
less of life or less of the life due to accident.
2.0 DECLARATION:
The contractor shall made declaration as under:-
"I have made myself thoroughly conversant conditions as regards the availabilities
or otherwise of all construction materials skilled and unskilled labour on which. I
have quoted my rates for this work. The specifications, drawing and design of this
work have been careful studies and are understood by me before the submission of
GUJARAT WATER SUPPLY AND SEWERAGE BOARD
-: SPECIAL NOTE:-
1) Contractor shall have to test the materials to be used in this work at his
3) Necessary Sign Board placed on site before commencement of work with
details; Like Estimated cost of work, Name of Agency, Time limit etc. If
agency failure; Rs.5, 000/- deducted from first Running bill as penalty.
Signature of Contractor Executive Engineer
Public Health Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00_Title_ P_0.pdf
01B_NIT_.pdf
01C_P.pdf
02_VOL 1 A Technical Bid_.pdf
03A_VOL 1 B GCC_.pdf
04A_Memorandum_.pdf
04B_ Volume-III Price bid_.pdf
05A_Schedule of Payment_.pdf
06_Itemwise Spe. Civil_.pdf
07_General Specifications_.pdf
08_Special Note_.pdf
09_INTEGRITY PACT_.pdf
10_Vendor list_.pdf
11_1.2_Royelty_18.06.19_New rate.pdf
12_05_Ann 5 Purchase Policy.pdf
13_06_Any-6A_Labour Circular.pdf
14_6_Mecilianius-min.pdf
15_07_Ann 6B shramyogi GR.pdf
16_7_GR LD Deduction 10-1-2018.pdf
17_08_GST GR.pdf
18_8_Circular_26_SIGN BOARD.pdf
19_13_GR- PART - 1_01 to 11.pdf
20_Min wages Circular.pdf
21_DMO_2941_01-Apr-2026_744.pdf
She-A and B.pdf
Download all tender documents and submit your bid